101 |
CESC Ltd |
TP-77/18-19 |
Thursday, February 3, 2022 |
2018-2019, 2019-2020 |
IN RE THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2018-2019 AND 2019-2020 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
102 |
WBSEDCL |
FPPCA-80/16-17 AND APR-55/16-17 |
Thursday, February 3, 2022 |
2015-2016 |
IN REGARD TO THE APPLICATIONS OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2015-2016
|
103 |
WBPDCL |
APR-78/19-20 |
Monday, January 24, 2022 |
2013-2014 |
IN THE MATTER OF PETITION FILED BY WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED IN PURSUANCE TO ORDER DATED 15.07.2019 ISSUED BY THE APPELLATE TRIBUNAL FOR ELECTRICITY (APTEL) IN APPEAL NO. 348 OF 2017 (APPEAL) ALONG WITH I.A.NO. 1101 OF 2019 AGAINST THE APR ORDER DATED 24.08.2017 ISSUED BY THE COMMISSION IN CASE NO. FPPCA-73/14-15 AND APR-45/14-15 FOR THE YEAR 2013-2014
|
104 |
WBSEDCL |
TP(R)-28/18-19 |
Wednesday, January 19, 2022 |
2014-2015, 2015-2016, 2016-2017 |
IN THE MATTER OF PETITION FILED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITE IN PURSUANCE TO ORDER DATED 18.02.2019 ISSUED BY THE APPELLATE TRIBUNAL FOR ELECTRICITY IN APPEAL NO. 215 OF 2015 AGAINST THE TARIFF ORDER ISSUED BY THE COMMISSION VIDE DATED 04.03.2015 IN CASE NO. TP-61/13-14 FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 (MYT TARIFF) AND THE TARIFF FOR THE YEAR 2014-2015 UNDER THE FOURTH CONTROL PERIOD
|
105 |
WBSEDCL |
APR(R)-7/18-19 |
Friday, November 12, 2021 |
2011-2012 |
IN REGARD TO THE APPLICATION FOR REVIEW UNDER REGULATION 3.3. READ WITH REGULATION 3.10,3.11 AND 3.12 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 AGAINST THE ORDER IN CASE NO. APR-35/12-13 DATED 09.09.2013 REGARDING THE ANNUAL PERFORMANCE REVIEW OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FY 2011-12 IN PURSUANT TO ORDER DATED 28.11.2018 IN APPEAL 267 OF 2015 PASSED BY HON'BLE APPELLATE TRIBUNAL FOR ELECTRICITY
|
106 |
WBSEDCL |
FPPCA-75/15-16 AND APR-52/15-16 |
Wednesday, November 3, 2021 |
2014-2015 |
IN REGARD TO THE APPLICATIONS OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2014-2015
|
107 |
WBPDCL |
TP-95/20-21 |
Friday, October 8, 2021 |
2020-2021, 2021-2022 |
IN REGARD TO THE DETERMINATION OF TARIFF, ARR AND EXPECTED REVENUE FROM CHARGES FOR THE SEVENTH CONTROL PERIOD CONSISTING OF THE FINANCIAL YEARS 2020-21 TO 2022-23 OF WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED (WBPDCL)
|
108 |
WBSEDCL |
APR(R)-7/18-19 |
Thursday, October 7, 2021 |
2011-2012 |
IN REGARD TO THE PETITION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR REVIEW OF ANNUAL PERFORMANCE REVIEW ORDER DATED 09.09.2013NFOR THE YEAR 2011-2012 IN CASE NO APR-35/12-13 IN TERMS OF REGULATION 3.3. READ WITH REGULATIONS 3.10,3.11 AND 3.12 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( CONDUCT OF BUSINESS) REGULATIONS,2013
|
109 |
HMEL |
TP-97/20-21 |
Friday, September 10, 2021 |
2020-2021, 2021-2022 |
CORRIGENDUM TO THE ORDER DATED 25.08.2021 OF THE COMMISSION IN RESPECT OF THE HIRANMAYEE ENERGY LIMITED IN REGARD TO THE MULTI YEAR TARIFF APPLICATION IN CASE NO TP-97/20-21
|
110 |
HEL |
TP-75/18-19 |
Wednesday, September 8, 2021 |
2018-2019, 2019-2020 |
IN REGARD TO THE DETERMINATION OF TARIFF,ARR AND EXPECTED REVENUE FROM CHARGES FOR THE SIXTH CONTROL PERIOD CONSISTING OF THE FINANCIAL YEARS 2018-19 AND 2019-20 OF HALDIA ENERGY LIMITED
|
111 |
WBSEDCL |
TP-84/19-20 |
Wednesday, August 25, 2021 |
2018-2019, 2019-2020 |
IN REGARD TO THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEAR 2018-2019 AND 2019-2020 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
112 |
HMEL |
TP-97/20-21 |
Wednesday, August 25, 2021 |
2020-2021, 2021-2022 |
IN REGARD TO THE MULTI YEAR TARIFF APLICATION UNDER SEVENTH CONTROL PERIOD OF THE HIRANMAYE ENERGY LIMITED FOR THE EYARS 2020-21,2021-22 AND 2022-23 UNDER SECTION 64(3)(a) READ WITH SECTION 61(1) OF THE ELECTRICITY ACT,2003
|
113 |
DPL |
TP-93/2020-21 |
Tuesday, August 17, 2021 |
2020-2021, 2021-2022 |
CORRIGENDUM TO THE ORDER DATED 16.07.2021 PASSED BY THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ON 17.08.2021 IN CASE NO TP-93/2020-21
|
114 |
WBSEDCL |
TP(R)-28/18-19 |
Monday, August 2, 2021 |
2014-2015, 2015-2016, 2016-2017 |
IN THE MATTER OF PETITION FILED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED IN PURSUANCE TO ORDER DATED 18.02.2019 ISSUED BY THE APPELLATE TRIBUNAL FOR ELECTRICITY IN APPEAL NO. 215 OF 2015 AGAINST THE TARIFF ORDER ISSUED BY THE COMMISSION VIDE DATED 04.03.2015 IN CASE NO. TP-61/13-14 FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 (MYT TARIFF) AND THE TARIFF FOR THE YEAR 2014-2015 UNDER THE FOURTH CONTROL PERIOD
|
115 |
DVC |
APR-81/20-21 |
Monday, July 19, 2021 |
2006-2007, 2007-2008, 2008-2009 |
IN REGARD TO THE APPLICATION FOR TRUING UP/ANNUAL PERFORMANCE REVIEW FOR THE YEARS 2006-07 TO 2008-09 IN RESPECT OF DISTRIBUTION AND RETAIL SUPPLY OF ELECTRICITY BY DAMODAR VALLEY CORPORATION FOR THE PART OF THE DAMODAR VALLEY ARE FALLING WITHIN THE TERRITORY OF THE STATE OF WEST BENGAL
|
116 |
DPL |
TP-93/2020-21 |
Friday, July 16, 2021 |
2020-2021, 2021-2022 |
IN REGARD TO THE MULTI-YEAR TARIFF APPLICATION UNDER THE SEVENTH CONTROL PERIOD OF THE DURGAPUR PROJECTS LIMITED FOR THE YEARS 2020-21, 2021-22 AND 2022-23 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT,2003
|
117 |
WBPDCL |
TP-85/19-20 |
Wednesday, July 14, 2021 |
2018-2019, 2019-2020 |
IN REGARD TO THE DETERMINATION OF TARIFF,ARR AND EXPECTED REVENUE FROM CHARGES FOR THE SIXTH CONTROL PERIOD CONSISTING OF THE FINANCIAL YEARS 2018-19 AND 2019-20 OF WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
|
118 |
WBSEDCL |
FPPCA-70/14-15 AND APR 46/14-15 |
Wednesday, July 14, 2021 |
2013-2014 |
IN RE APPLICATIONS OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013-2014
|
119 |
IPCL |
TP-78/18-19 |
Friday, July 9, 2021 |
2018-2019, 2019-2020 |
IN REGARD TO THE TARIFF APPLICATION OF INDIA POWER CORPORATION LIMITED FOR THE YEAR 2018-19 AND 2019-20 COVERING SIXTH CONTROL PERIOD UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
120 |
WBSETCL |
APR-51/15-16 |
Monday, June 28, 2021 |
2014-2015 |
IN REGARD TO THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2014-2015
|
121 |
WBSETCL |
TP-90/20-21 |
Friday, June 25, 2021 |
2020-2021, 2021-2022 |
IN REGARD TO THE MULTI YEAR TARIFF APPLICATION UNDER SEVENTH CONTROL PERIOD OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2020-21, 2021-22 AND 2022-23 UNDER SECTION 64 (3) (a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003.
|
122 |
HMEL |
TP-82/19-20 |
Monday, May 31, 2021 |
2018-2019, 2019-2020 |
IN RE THE MULTI YEAR TARIFF APPLICATION UNDER SIXTH-CONTROL PERIOD OF THE HIRANMAYEE ENERGY LIMITED FOR THE YEARS 2018-2019 AND 2019-2020 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
123 |
DVC |
APR-53/15-16 |
Monday, May 31, 2021 |
2009-2010, 2010-2011, 2011-2012, 2012-2013, 2013-2014 |
IN RESPONSE TO THE APPLICATION OF DAMODAR VALLEY CORPORATION FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEARS FROM 2009-2010 TO 2013-14
|
124 |
WBSEDCL |
APR(R)-8/18-19(II) |
Friday, May 21, 2021 |
2012-2013 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR REVIEW PETITION UNDER REGULATION 3.3 READ WITH REGULATIONS 3.10,3.11 AND 3.12 OF THE WBERC ( CONDUCT OF BUSINESS) REGULATIONS, 2013 AGAINST THE ORDER IN CASE NO APR-38/13-14 DATED 12.06.2014 REGARDING APR OF WBSEDCL FOR THE FINANCIAL YEAR 2012-13.
|
125 |
DVC |
TP-71/16-17 |
Thursday, May 20, 2021 |
2017-2018 |
IN RESPONSE TO THE APPLICATION SUBMITTED BY DAMODAR VALLEY CORPORATION (DVC) ON 29.12.2016 FOR DETERMINATION OF TARIFF FOR DISTRIBUTION AND RETAIL SUPPLY OF ELECTRICITY FOR THE PART OF THE DAMODAR VALLEY AREA FALLING WITHIN THE TERRITORY OF THE STATE OF WEST BENGAL FOR THE YEAR 2017 − 2018.
|
126 |
IPCL |
TP-74/16-17 |
Thursday, January 28, 2021 |
2017-2018 |
IN REGARD TO THE TARIFF APPLICATION OF INDIA POWER CORPORATION LIMITED FOR THE YEAR 2017-2018 COVERING FIFTH CONTROL PERIOD UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
127 |
WBSETCL |
TP-86/19-20 |
Wednesday, December 16, 2020 |
2018-2019, 2019-2020 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2018-2019 AND 2019-2020 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
128 |
IPCL |
FPPCA-69/14-15 AND APR-47/14-15 |
Friday, November 27, 2020 |
2013-2014 |
IN RE APPLICATIONS OF INDIA POWER CORPORATION LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013- 2014
|
129 |
CESC Ltd |
FPPCA-71/14-15 AND APR-44/14-15 |
Friday, November 27, 2020 |
2013-2014 |
CORRIGENDUM TO THE ORDER DATED 02.03.2020 OF THE COMMISSION IN REGARD TO THE FPPCA AND APR APPLICATIONS OF THE CESC LIMITED, FOR THE FINANCIAL YEAR 2013-2014 IN CASES NO FPPCA-71/14-15 AND APR-44/14-15
|
130 |
DPL |
TP-87/19-20 (PART-II) |
Friday, November 13, 2020 |
2018-2019, 2019-2020 |
IN REGARD TO THE MULTI YEAR TARIFF APPLICATION UNDER SIXTH CONTROL PERIOD (PART-II) OF THE DURGAPUR PROJECTS LIMITED FOR THE YEAR 2018-19 ( FROM 01.01.2019 TO 31.03.2019) AND 2019-20 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
131 |
DPL |
TP-87/19-20 |
Sunday, October 11, 2020 |
2018-2019 |
IN REGARD TO THE MULTI YEAR TARIFF APPLICATION UNDER SIXTH CONTROL PERIOD OF THE DURGAPUR PROJECTS LIMITED FOR THE YEAR 2018-19 [ UPTO THE PERIOD 31.12.2018 (PART - I)] UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
132 |
DVC |
TP(R)-30/20-21 |
Tuesday, October 6, 2020 |
2006-2007, 2007-2008, 2008-2009 |
IN RE THE PETITION SUBMITTED BY DAMODAR VALLEY CORPORATION FOR REVIEW OF TARIFF ORDER DATED 19.06.2020 FOR THE YEARS 2006-2007 , 2007-2008 AND 2008-2009
|
133 |
DPL |
TP-66/16-17 |
Monday, August 3, 2020 |
2017-2018 |
IN REGARD TO THE MULTI YEAR TARIFF APPLICATION UNDER FIFTH CONTROL PERIOD OF THE DURGAPUR PROJECTS LIMITED FOR THE YEAR 2017-18 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
134 |
WBSETCL |
APR- 42 / 14-15 |
Monday, July 20, 2020 |
2013-2014 |
IN RE THE APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2013 - 2014
|
135 |
DVC |
TP-80/19-20/1 |
Wednesday, July 1, 2020 |
2006-2007, 2007-2008, 2008-2009 |
IN REGARD TO THE COMPLIANCE OF THE DIRECTIVES IN TERMS OF THE TARIFF ORDER OF DAMODAR VALLEY CORPORATION (DVC) DATED 19.06.2020 IN RESPECT OF THE DISTRIBUTION ACTIVITY OF DVC IN THE STATE OF WEST BENGAL FOR THE PERIOD FY 2006-2007 TO 2008-2009
|
136 |
DVC |
TP-80/19-20 |
Friday, June 19, 2020 |
2006-2007, 2007-2008, 2008-2009 |
IN REGARD TO THE APPLICATION OF THE DAMODAR VALLEY CORPORATION IN TERMS OF ORDER PASSED BY THE HON'BLE HIGH COURT AT CALCUTTA ON 05.03.2019 FOR DETERMINATION OF
RETAIL TARIFF FOR THE CONSUMERS IN THE AREA OF THE STATE OF WEST BENGAL FOR THE YEARS 2006-07 - 2008-09 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF
THE ELECTRICITY ACT, 2003
|
137 |
CESC Ltd |
TP-72/16-17-COMPLIANCE |
Monday, June 15, 2020 |
2017-2018 |
IN REGARD TO THE PETITION SUBMITTED BY CESC LIMITED SEEKING EXTENSION OF TIME FOR COMPLIANCE WITH THE DIRECTION PASSED VIDE ORDER DATED 02.03.2020 IN CASE NO TP-72/16-17-COMPLIANCE
|
138 |
DVC |
TP-83/19-20 |
Thursday, March 19, 2020 |
2009-2010, 2010-2011, 2011-2012, 2012-2013 |
IN REGARD TO THE APPLICATION OF THE DAMODAR VALLEY
CORPORATION IN TERMS OF ORDER PASSED BY THE HON'BLE
HIGH COURT AT CALCUTTA ON 12.06.2019 FOR DETERMINATION
OF RETAIL TARIFF FOR THE CONSUMERS IN THE AREA OF THE
STATE OF WEST BENGAL FOR THE YEARS 2009-10 - 2012-13
UNDER SECTION 64(3)(a) READ WITH SECTION 61(1) AND SECTION
62(3) OF THE ELECTRICITY ACT, 2003
|
139 |
CESC Ltd |
TP-72/16-17-COMPLIANCE |
Monday, March 2, 2020 |
2017-2018 |
ORDER OF THE COMMISSION IN REGARD TO DIRECTIONS GIVEN IN THE TARIFF ORDER FOR THE YEAR 2017-1018
|
140 |
CESC Ltd |
FPPCA-71/14-15 AND APR-44/14-15 |
Monday, March 2, 2020 |
2013-2014 |
IN RE APPLICATIONS OF CESC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013-14
|
141 |
IPCL |
APR- 41/13 -14 |
Monday, December 2, 2019 |
2012-2013 |
IN REGARD TO THE APPLICATION OF THE DPSC LIMITED (NOW IPCL) FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012 - 2013
|
142 |
WBPDCL |
TP(R)-27/18-19 |
Monday, December 2, 2019 |
2017-2018 |
IN REGARD TO PETITION SUBMITTED BY THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR REVIEW OF TARIFF ORDER DATED 13.09.2018 FOR THE YEAR 2017 - 2018 IN CASE NO.TP-69/16-17
|
143 |
WBPDCL |
APR(R)-3/13-14 |
Friday, November 1, 2019 |
2011-2012 |
IN REGARD TO PETITION SUBMITTED BY THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR REVIEW OF ANNUAL PERFORMANCE REVIEW ORDER DATED 05.09.2013 FOR THE YEAR 2011- 2012 IN CASE NO. APR-31/12-13
|
144 |
WBPDCL |
TP-69 /16-17 |
Thursday, September 13, 2018 |
2017-2018 |
IN RE THE MULTI YEAR TARIFF APPLICATION UNDER FIFTH CONTROL PERIOD OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEAR 2017 – 2018
|
145 |
WBPDCL |
APR(R)-6/14-15 |
Wednesday, August 29, 2018 |
2012-2013 |
IN RE PETITION SUBMITTED BY THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR REVIEW OF ANNUAL PERFORMANCE REVIEW ORDER DATED 21.07.2014 FOR THE YEAR 2012-13 IN CASE NO. APR- 39 / 13 - 14
|
146 |
DPL |
CASE NO: FPPCA(R)-4/17-18 |
Wednesday, August 29, 2018 |
2013-2014 |
IN RE PETITION SUBMITTED BY THE DURGAPUR PROJECT LIMITED FOR REVIEW OF ANNUAL PERFORMANCE REVIEW ORDER DATED 16.02.2017 FOR THE YEAR 2013-14 IN CASE NO. FPPCA- 72 / 14-15 AND APR - 43 / 14 - 15
|
147 |
DVC |
TP(R)-25/15-16 |
Thursday, July 12, 2018 |
2014-2015, 2015-2016, 2016-2017 |
IN RE PETITION SUBMITTED BY DAMODAR VALLEY CORPORATION FOR REVIEW OF TARIFF ORDER DATED 25.05.2015 FOR THE YEARS 2014- 2015 TO 2016 - 2017 IN CASE NO. TP - 57 / 13 -14
|
148 |
CESC Ltd |
TP – 72 / 16 - 17 |
Wednesday, July 4, 2018 |
2017-2018 |
IN RE THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEAR 2017 – 2018 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
149 |
WBSETCL |
TP – 70 / 16 - 17 |
Wednesday, July 4, 2018 |
2017-2018 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEAR 2017 – 2018 UNDER SECTION 64(3)(a) READ WITH SECTION 62 (1) OF THE ELECTRICITY ACT, 2003
|
150 |
WBSEDCL |
TP – 65 / 16 - 17 |
Wednesday, July 4, 2018 |
2017-2018 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEAR 2017 – 2018 COVERING FIFTH CONTROL PERIOD UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|