151 |
HEL |
TP – 68 / 16 – 17 |
Monday, November 27, 2017 |
2017-2018 |
IN RE THE MULTI YEAR TARIFF APPLICATION OF HALDIA ENERGY LIMITED UNDER FIFTH CONTROL PERIOD FOR THE YEAR 2017 – 2018 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
152 |
WBPDCL |
FPPCA – 73 / 14 – 15 AND APR – 45 / 14 - 15 |
Thursday, August 24, 2017 |
2013-2014 |
IN RE APPLICATIONS OF WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR FUEL COST ADJUSTMENT (FCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013- 2014
|
153 |
WBPDCL |
TP – 73 / 16 – 17 |
Friday, July 7, 2017 |
2016-2017 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR DETERMINATION OF TARIFF FOR EXTENSION UNITS NO III AND IV OF ITS THERMAL POWER STATION AT SAGARDIGHI FOR THE YEAR 2016 – 2017 UNDER FOURTH CONTROL PERIOD UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
154 |
DVC |
TP – 57 / 13 -14 |
Friday, March 3, 2017 |
2016-2017 |
THE TARIFF APPLICATION OF DAMODAR VALLEY CORPORATION FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
155 |
IPCL |
TP(R) -26/16- 17 |
Friday, February 17, 2017 |
2016-2017 |
REVIEW OF THE TARIFF ORDER DATED 21ST JULY, 2016 PASSED BY THE COMMISSION IN CASE NO. TP-58/13-14 IN RESPECT OF INDIA POWER CORPORATION LIMITED FOR THE YEARS 2014 – 2015, 2015 – 2016 AND 2016-2017 EMERGED UPON SCRUTINY OF THE SAID TARIFF ORDER
|
156 |
DPL |
FPPCA – 72 / 14 – 15 AND APR – 43 / 14 - 15 |
Thursday, February 16, 2017 |
2013-2014 |
APPLICATIONS OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013-2014
|
157 |
WBSEDCL |
TP – 61 / 13 – 14 |
Friday, October 28, 2016 |
2016-2017 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
158 |
WBSETCL |
TP – 60 / 13 - 14 |
Friday, October 28, 2016 |
2016-2017 |
THE TARIFF APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
159 |
CESC Ltd |
TP – 56 / 13 - 14 |
Friday, October 28, 2016 |
2016-2017 |
THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
160 |
DPL |
TP – 55/13- 14 |
Friday, October 28, 2016 |
2016-2017 |
THE TARIFF APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
161 |
WBPDCL |
TP – 59 / 13 – 14 |
Friday, October 28, 2016 |
2016-2017 |
THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
162 |
IPCL |
FPPCA – 64 / 13 – 14 |
Monday, September 12, 2016 |
2012-2013 |
APPLICATION OF INDIAN POWER CORPORATION LIMITED IN THE MATTER OF FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA)OF DPSC LIMITED (DPSCL)FOR THE FINANCIAL YEAR 2012–2013
|
163 |
IPCL |
TP – 58 / 13 – 14 |
Thursday, July 21, 2016 |
2014-2015, 2015-2016, 2016-2017 |
THE TARIFF APPLICATION OF INDIA POWER CORPORATION LIMITED FOR THE YEARS 2014-15,2015-16 AND 2016-17 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
164 |
HEL |
TP – 64 / 14 - 15 |
Friday, January 29, 2016 |
2014-2015, 2015-2016, 2016-2017 |
Tariff Order FOR 2 X 300 MW GENERATING STATION AT HALDIA FOR THE YEARS 2014 – 2015, 2015 – 2016 AND 2016 – 2017 dated 29.01.2016
|
165 |
HEL |
TP – 63 / 14 - 15 |
Friday, January 29, 2016 |
2014-2015, 2015-2016, 2016-2017 |
Tariff Order FOR 400 KV DOUBLE CIRCUIT DEDICATED LINE FOR EVACUATION OF POWER UPTO 400 KV SUBHASGRAM SUBSTATION OF POWER GRID CORPORATION FOR THE YEARS 2014 – 2015, 2015 – 2016 AND 2016 – 2017 dated 29.01.2016
|
166 |
WBSEDCL |
TP - 61 / 13-14 |
Friday, October 30, 2015 |
2013-2014 |
IN RE THE DETERMINATION OF WHEELING CHARGES PAYABLE TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2015 - 2016 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003 .
|
167 |
CESC Ltd |
TP –56 / 13-14 |
Thursday, October 29, 2015 |
2015-2016 |
IN RE THE DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2015 – 2016 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003.
|
168 |
DPL |
TP – 55/13- 14 |
Thursday, October 29, 2015 |
2015-2016 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2015–2016 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003
|
169 |
DVC |
TP – 62 / 14 - 15 |
Monday, August 24, 2015 |
2009-2010 |
THE TARIFF APPLICATION OF DAMODAR VALLEY CORPORATION FOR THE YEARS 2009– 2010, 2010 –2011,2011– 2012, 2012– 2013 AND 2013– 2014 UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
170 |
WBSEDCL |
TP – 61 / 13 – 14 |
Monday, August 10, 2015 |
2015-2016 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
171 |
CESC Ltd |
TP – 56 / 13 - 14 |
Monday, August 10, 2015 |
2015-2016 |
THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
172 |
DPL |
TP – 55 / 13 - 14 |
Tuesday, June 23, 2015 |
2015-2016 |
IN RE THE TARIFF APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
173 |
WBSETCL |
TP – 60 / 13 - 14 |
Monday, June 22, 2015 |
2015-2016 |
THE TARIFF APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2014-2015,2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
174 |
WBPDCL |
TP – 59 / 13 – 14 |
Friday, June 19, 2015 |
2015-2016 |
THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
175 |
DVC |
TP – 57 / 13 -14 |
Monday, May 25, 2015 |
2014-2015 |
THE TARIFF APPLICATION OF DAMODAR VALLEY CORPORATION FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
176 |
CESC Ltd |
TP –56 / 13-14 |
Friday, March 20, 2015 |
2014-2015 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2014– 2015 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003
|
177 |
DPL |
TP – 55/13- 14 |
Friday, March 20, 2015 |
2014-2015 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2014–2015 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003
|
178 |
WBSEDCL |
TP – 61 / 13 - 14 |
Wednesday, March 4, 2015 |
2014-2015 |
THE TARIFF APPLICATION OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
179 |
WBSETCL |
TP – 60 / 13 - 14 |
Wednesday, March 4, 2015 |
2014-2015 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2014– 2015,2015– 2016 AND 2016– 2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
180 |
CESC Ltd |
TP – 56 / 13 - 14 |
Wednesday, March 4, 2015 |
2014-2015 |
THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
181 |
DPL |
TP - 55/13 - 14 |
Wednesday, March 4, 2015 |
2014-2015 |
Corrigendum to the Tariff Order dated 04.03.2015 of the Commission including the corrigendum dated 19.03.2015 in regard to the Tariff Application of the Durgapur Projects Limited (DPL) for the years 2014-2015 to 2016-2017 in Case No TP-55/13-14
|
182 |
WBPDCL |
TP – 59 / 13 – 14 |
Wednesday, March 4, 2015 |
2014-2015 |
THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
183 |
WBPDCL |
WBERC/FPPCA-61/12-13 AND WBERC/FPPCA-67/13-14 |
Thursday, December 11, 2014 |
2012-2013 |
THE SUBMISSION MADE BY THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED (WBPDCL) FOR RECOVERY OF ARREAR FUEL COST ADJUSTMENT CLAIMS (FCA) ON ACCOUNT OF FCA ORDERS FOR THE YEAR 2011-12 AND 2012-13.
|
184 |
WBPDCL |
APR – 39 / 13 – 14 |
Monday, July 21, 2014 |
2012-2013 |
THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR ANNUAL PERFORMANCE REVIEW OF THE FINANCIAL YEAR 2012–2013
|
185 |
WBSEDCL |
APR – 38 / 13 – 14 |
Thursday, June 12, 2014 |
2012-2013 |
THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012–2013.
|
186 |
WBSETCL |
APR – 37 / 13 – 14 |
Tuesday, June 10, 2014 |
2012-2013 |
THE APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012–2013
|
187 |
WBPDCL |
FPPCA-67/13 – 14 |
Friday, June 6, 2014 |
2012-2013 |
IN RE THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR FUEL COST ADJUSTMENT (FCA) FOR THE FINANCIAL YEAR 2012 – 2013
|
188 |
CESC Ltd |
APR – 36 / 13 – 14 |
Wednesday, May 21, 2014 |
2012-2013 |
THE APPLICATION OF CESC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012-13
|
189 |
DPL |
APR – 40 / 13 – 14 |
Wednesday, May 21, 2014 |
2012-2013 |
THE APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012– 2013
|
190 |
DPL |
FPPCA – 68 / 13 – 14 |
Wednesday, April 30, 2014 |
2012-2013 |
APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2012-2013.
|
191 |
IPCL |
TP – 51/ 11 – 12 |
Tuesday, April 1, 2014 |
2013-2014 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2013-2014 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003
|
192 |
IPCL |
TP – 51/ 11 – 12 |
Tuesday, April 1, 2014 |
2012-2013 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2012-2013 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003
|
193 |
IPCL |
TP – 51/ 11 – 12 |
Tuesday, April 1, 2014 |
2011-2012 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2011-2012 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003
|
194 |
DPL |
TP – 49/11- 12 |
Friday, March 28, 2014 |
2013-2014 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2013-2014 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003
|
195 |
DPL |
TP – 49/11- 12 |
Friday, March 28, 2014 |
2012-2013 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2012–2013 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003
|
196 |
DPL |
TP – 49/11- 12 |
Friday, March 28, 2014 |
2011-2012 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2011–2012 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003
|
197 |
CESC Ltd |
FPPCA – 65 / 13 - 14 |
Tuesday, March 4, 2014 |
2012-2013 |
APPLICATION OF THE CESC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2012-2013
|
198 |
WBSEDCL |
FPPCA – 66 / 13 – 14 |
Tuesday, March 4, 2014 |
2012-2013 |
APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2012-2013
|
199 |
CESC Ltd |
TP –48 / 11-12 |
Tuesday, March 4, 2014 |
2013-2014 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2013– 2014 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003
|
200 |
CESC Ltd |
TP –48 / 11-12 |
Tuesday, March 4, 2014 |
2012-2013 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2013–2014 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003
|