Sl. No |
Case No. |
Date |
Matter |
151. |
OA-348/20-21 |
Wednesday, February 9, 2022 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR INVESTMENT APPROVAL FOR CONVERSION OF OVERHEAD DISTRIBUTION SYSTEM TO UNDERGROUND AT CHINSURAH AND KRISHNANAGAR TOWN IN HOOGHLY AND NADIA DISTRICT RESPECTIVELY IN TERMS OF REGULATION 2.8.2.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011, AS AMENDED |
152. |
OA-386/21-22 |
Thursday, February 3, 2022 |
IN REGARD TO THE APPLICATION FOR ISSUANCE OF APPROPRIATE ORDER FOR UNIVERSALIZATION OF MONTHLY BILLING CYCLE OR BILLING PERIOD FOR ALL CONSUMERS OF WBSEDCL |
153. |
OA-372/20-21 |
Wednesday, February 2, 2022 |
IN REGARD TO THE APPLICATION SUBMITTED FOR IN-PRINCIPLE CLEARANCE FOR INSTALLATION OF FLUE GAS DESULPHURIZATION (FGD) IN THE 3 X 150 MW THERMAL POWER STATION OF HIRANMAYE ENERGY LIMITED |
154. |
OA-373/21-22 |
Monday, January 31, 2022 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR INVESTMENT APPROVAL FOR DISTRIBUTION SYSTEM IMPROVEMENT SCHEME (DSIS) IN TERMS OF REGULATION 2.8.2.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011, AS AMENDED |
155. |
B-11/23 |
Monday, January 24, 2022 |
IN REGARD TO IMPLEMENTATION OF THE DIRECTIONS OF THE GOVERNMENT OF WEST BENGAL IN THE DEPARTMENT OF POWER DATED 23.12.2021 UNDER SECTION 108 OF THE ELECTRICITY ACT,2003 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION TO ISSUE APPROPRIATE ORDER FOR PROVIDING SUBSIDY TO THE CONSUMERS IN REGARD TO THE TARIFF ORDER DATED 25.08.2021 PASSED BY THE COMMISSION IN RESPECT OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED |
156. |
C-15/993 |
Friday, January 21, 2022 |
IN THE MATTER OF APPLICATIONS BY SURYA ALLOY INDUSTRIES LIMITED, SEEKING INTERVENTION OF THE COMMISSION IN THE MATTER OF ARBITRARY AND UNJUSTIFIED DEMAND ON ACCOUNT OF ADDITIONAL ENERGY CHARGES DURING RESTRICTED DRAWAL PERIOD FOR THE MONTHS BETWEEN JUNE 2015 TO JULY,2018. |
157. |
OA-339/20-21 |
Thursday, January 20, 2022 |
IN REGARD TO THE APPLICATION SUBMITTED BY CESC LIMITED FOR IN-PRINCIPLE APPROVAL OF CAPITAL EXPENDITURE FOR INSTALLATION OF LIMESTONE BASED WET FLUE GAS DESULPHURIZATION PLANT AT BUDGE BUDGE GENERATING STATION |
158. |
OA-338/20-21 |
Thursday, January 20, 2022 |
IN REGARD TO THE APPLICATION SUBMITTED BY HALDIA ENERGY LIMITED (HEL) FOR IN-PRINCIPLE APPROVAL OF CAPITAL EXPENDITURE FOR INSTALLATION OF LIMESTONE BASED WET FLUE GAS DESULPHURIZATION PLANT FOR 2 x 300 MW COAL BASED THERMAL PROJECT AT HALDIA |
159. |
OA-381/21-22 |
Monday, January 3, 2022 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR ISSUANCE OF APPROPRIATE ORDER FOR IMPLEMENTING DEMAND CHARGE TO ALL CLASS OF CONSUMERS HAVING CONTRACT LOAD OF 30 KVA AND ABOVE UNDER MONTHLY BILLING SYSTEM AT A RATE AS STIPULATED IN THE RESPECTIVE TARIFF ORDER FOLLOWING THE REGULATION 4.3.1 OF WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011, AS AMENDED |
160. |
OA-340/20-21 |
Monday, December 27, 2021 |
IN THE MATTER OF APPLICATION MADE BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR ISSUANCE OF APPROPRIATE ORDER UNDER REGULATION 2.1.3. (C) OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( CONDUCT OF BUSINESS), 2013 AS AMENDED SO THAT CONSUMERS OF WBSEDCL DOES NOT REQUIRE TO BEAR HIGH ENERGY COST OF THERMAL POWER STATION AT RAGHUNATHPUR, PURULIA DISTRICT, WEST BENGAL (RTPS) OF DAMODAR VALLEY CORPORATION (DVC) |
161. |
OA-382/21-22 |
Wednesday, December 22, 2021 |
IN REGARD TO THE APPLICATION SUBMITTED BY INDIA POWER CORPORATION LIMITED (IPCL) UNDER REGULATION NO. 5.15.1 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( LICENSING AND CONDITIONS OF LICENSE) REGULATIONS, 2013 SEEKING INTERPRETATION WITH RESPECT TO LICENSE AND TERMS AND CONDITIONS OF LICENSE OF IPCL |
162. |
OA-349/20-21 |
Thursday, December 16, 2021 |
IN THE MATTER OF APPLICATION BY ULTRATECH CEMENT LIMITED SEEKING INTERVENTION OF THE COMMISSION IN REGARD TO RELEASE OF NOC BY WBSEDCL FOR WHEELING OF 7.425 MW AND 10.00 MW OF POWER BY ULTRATECH CEMENT LIMITED FROM THEIR CAPTIVE POWER PLANT AT BHATAPARA - BALODA BAZAR , CHHATTISGARH TO THEIR WORKS AT DANKUNI, WEST BENGAL AND RAGHUNATHGANJ, DISTRICT: MURSHIDABAD, WEST BENGAL, RESPECTIVELY |
163. |
OA-377/21-22 |
Friday, December 10, 2021 |
IN REGARD TO THE APPLICATION SUBMITTED BY INDIA POWER CORPORATION LIMITED FOR APPROVAL OF DETAILED PROCEDURE FOR RECEIVING AND DISPOSAL OF APPLICATION FOR CONNECTIVITY OF SOLAR PV GENERATING SYSTEM OF ELIGIBLE CONSUMERS AS REQUIRED UNDER REGULATION 16.9 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (COGENERATION AND GENERATION OF ELECTRICITY FROM RENEWABLE SOURCES OF ENERGY) (FIRST AMENDMENT) REGULATIONS, 2020 |
164. |
OA-351/20-21 |
Wednesday, December 8, 2021 |
APPLICATION BY BRAITHWAITE & COMPANY LIMITED SEEKING DIRECTION BY THE COMMISSION UPON CESC LIMITED TO ALLOW NET METERING FOR ROOF TOP GRID CONNECTED SOLAR PLANT UNDER RESCO MODEL AND ADJUDICATION OR RESOLUTION OF DISPUTE REGARDING REGULATION OF PURCHASE AND PROCUREMENT PROCESS OF ELECTRICITY |
165. |
OA-367/21-22 |
Wednesday, December 1, 2021 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR APPROVAL OF THE CONNECTION PROCEDURES FOR SOLAR PV GENERATING SYSTEM UNDER NET METERING OR NET BILLING ARRANGEMENT UNDER WBSEDCL PROCEDURE-C(2021) IN TERMS OF REGULATION 16.9 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (COGENERATION AND GENERATION OF ELECTRICITY FROM RENEWABLE SOURCES OF ENERGY) REGULATIONS,2013, AS AMENDED |
166. |
OA-376/21-22 |
Monday, November 29, 2021 |
IN REGARD TO THE APPLICATION SUBMITTED BY CESC LIMITED FOR APPROVAL OF PROCEDURE FOR EFFECTING CONNECTIVITY OF SOLAR PV GENERATING SYSTEM (SPGS) OF ELIGIBLE CONSUMERS WITH THE DISTRIBUTION NETWORK OF CESC LIMITED IN TERMS OF REGULATION 16.9 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (COGENERATION AND GENERATION OF ELECTRICITY FROM RENEWABLE SOURCES OF ENERGY) REGULATIONS,2013, AS AMENDED |
167. |
OA-235/16-17 |
Friday, November 12, 2021 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED (WBPDCL) FOR IN-PRINCIPLE APPROVAL FOR INVESTMENT IN RENOVATION AND MODERNIZATION PROGRAMME IN RESPECT OF UNITS 1,2, AND 3 OF KOLAGHAT THERMAL POWER STATION IN TERMS OF REGULATION 2.8.4.2.1 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS,2011, AS AMENDED |
168. |
OA-366/21-22 |
Tuesday, November 2, 2021 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR INVESTMENT APROVAL OF 'SECOND PHASE WORK' UNDER THE SCHEME FOR DISTRIBUTION NETWORK STRENGTHENING AND GRID MODERNIZATION IN TERMS OF REGULATION 2.8.2.3 OF THE WES BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS,2011, AS AMENDED |
169. |
OA-346/20-21 |
Tuesday, November 2, 2021 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR INVESTMENT APPROVAL OF 'FIRST PHASE WORK' UNDER THE SCHEME FOR DISTRIBUTION NETWORK STRENGTHENING AND GRID MODERNIZATION IN TERMS OF REGULATION 2.8.2.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011, AS AMENDED |
170. |
OA-362/20-21 |
Saturday, October 30, 2021 |
IN THE MATTER OF APPLICATION FOR REMOVAL OF DIFFICULTIES IN ACHIEVING THE NORMATIVE STATION HEAT RATE ALLOWED BY THE HON'BLE COMMISSION FOR SAGARDIGHI THERMAL POWER PROJECT,STAGE-II OF 1000 MW (2x500 MW) CAPACITY IN TERM OF REGULATION 8.10 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS,2011 AS AMENDED TIME TO TIME |
171. |
OA-341/20-21 |
Friday, October 29, 2021 |
IN THE MATTER OF APPLICATION UNDER SECTION 86(1)(f) READ WITH SECTION 86(1)(a) OF THE ELECTRICITY ACT,2003 FOR ADJUDICATION OF DISPUTES BETWEEN PHILIPS CARBON BLACK LIMITED [PCBL (PETITIONER)] AND WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED [WBSEDCL (RESPONDENT NO.1)] AND WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED [WBSETCL (RESPONDENT NO.2)] IN REGARD TO DETERMINATION/ADOPTION OF CHARGES PAYABLE BY THE PETITIONER TO THE RESPONDENT NO.1,IF ANY,FOR CONVEYANCE OF SURPLUS POWER FROM PETITIONER'S CO-GENERATION PLANT THROUGH OPEN ACCESS PURSUANT TO THE RESTRUCTURING OF ERSTWHILE DURGAPUR PROJECTS LIMITED(DPL). |
172. |
OA-355/20-21 |
Tuesday, October 26, 2021 |
IN THE MATTER OF PETITION FOR CONSIDERATION OF NET METERING FOR 3 MW ROOF TOP SOLAR PV TO BE DEVELOPED BY BHARAT ELECTRONICS LIMITED (BEL) IN THE PREMISES OF METAL & STEEL FACTORY (MSF) AT ISHAPORE |
173. |
WBERC/A-82/2 |
Monday, October 25, 2021 |
IN REGARD TO THE ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION TO REMOVE THE DIFFICULTY FACED BY THE INTENDING CONSUMERS FALLING UNDER NET BILLING AS PER PROVISIONS OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CO-GENERATION AND GENERATION OF ELECTRICITY FROM RENEWABLE SOURCES OF ENERGY) REGULATIONS,2013, AS AMENDED |
174. |
OA-319/19-20 |
Tuesday, October 5, 2021 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR INVESTMENT APPROVAL OF CIVIL PROJECT WORKS BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) IN TERMS OF REGULATION 2.8.2.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS,2011, AS AMENDED |
175. |
OA-371/21-22 |
Wednesday, September 29, 2021 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR ISSUANCE OF APPROPRIATE ORDER ALLOWING PROPORTIONATE POWER PURCHASE COST INCLUDING ALLIED TRANSMISSION CHARGE FOR SURPLUS POWER SOLD TO THE PERSONS OTHER THAN ITS OWN CONSUMERS AND LICENSEES DURING FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) ORDER IN ORDER TO PASS ON BENEFIT OF PARTLY RECOVERED FIXED COST TO CONSUMERS FROM ABOVE SALE OF SURPLUS POWER DURING TRUE UP |
176. |
OA-351/20-21 |
Monday, September 27, 2021 |
IN THE MATTER OF PETITION FOR NET METERING FOR ROOF TOP GRID CONNECTED SOLAR PLANT UNDER RESCO MODEL, ADJUDICATION OR RESOLUTION OF DISPUTE REGARDING REGULATION OF PURCHASE AND PROCUREMENT PROCESS OF ELECTRICITY |
177. |
OA-264/17-18 |
Monday, September 27, 2021 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR 'IN-PRINCIPLE' CLEARANCE I.R.O. INVESTMENT APPROVAL FOR INSTALLATION AND COMMISSIONING OF 1000 MW (4 x 250 MW) TURGA PUMPED STORAGE PROJECT AT PURULIA BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) IN TERMS OF REGULATION 2.8.1.4 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS,2011, AS AMENDED |
178. |
PPA-102/20-21 |
Monday, September 27, 2021 |
IN REGARD TO THE APPLICATION FOR APPROVAL OF SUPPLEMENTARY TO THE POWER PURCHASE AGREEMENT DATED 09.09.2010 AND 17.05.2011 (PRINCIPAL AGREEMENT) EXECUTED BY AND BETWEEN SOLITARIE INDUSTRIAL INFRASTRUCTURE PVT. LIMITED (SIIPL) AND THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) ON 12.10.2020 FOR PURCHASE OF ENTIRE EXPORTABLE POWER OF 05 MW FROM THE PHASE-I POWER STATION OF SIIPL FOR THE BALANCE PERIOD FROM 01/01/2019 20 31.03.2038 (I.E. 25 YEARS FROM COD) IN TERMS OF REGULATION 16.4 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (COGENERATION AND GENERATION OF ELECTRICITY FROM RENEWABLE SOURCES OF ENERGY) REGULATIONS,2013 READ WITH REGULATION 7.4.1 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS,2011 AS AMENDED. |
179. |
OA-268/17-18 |
Wednesday, September 22, 2021 |
IN THE MATTER OF APPLICATION BY M/S NIPPON POWER LIMITED SEEKING DIRECTION BY THE COMMISSION UPON WBSEDCL TO PAY RS. 253.18 LAKH ALONG WITH INTEREST @1.25% TO M/S NIPPON POWER LIMITED |
180. |
OA-328/19-20 |
Wednesday, September 15, 2021 |
IN REGARD TO THE APPLICATION SUBMITTED BY CESC LIMITED FOR APPROVAL OF PROCEDURE FOR NEW CONNECTION/LOAD EXTENSION FOR LOW AND MEDIUM VOLTAGE SINGLE BENEFICIARY CONSUMERS WITH UP TO 150 KVA CONTRACT DEMAND |