301 |
WBPDCL |
FPPCA-42/09-10 |
Tuesday, June 1, 2010 |
2008-2009 |
THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR FUEL COST ADJUSTMENT (FCA) FOR THE FINANCIAL YEAR 2008 – 2009 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
.
|
302 |
DPL |
TP-38/08-09 |
Monday, April 26, 2010 |
2009-2010 |
IN RE DIRECTION GIVEN BY THE GOVERNMENT OF WEST BENGAL UNDER SECTION 108 READ WITH SECTION 65 OF THE ELECTRICITY ACT, 2003 IN THE MATTER OF TARIFF ORDER DATED 28.07.2009 PASSED BY THE COMMISSION FOR THE YEAR 2009-2010 IN RESPECT OF THE DURGAPUR PROJECTS LIMITED IN CASE NO. TP-38/08-09
|
303 |
DPL |
TP-38/08-09 |
Monday, February 22, 2010 |
2008-2009 |
IN RE DIRECTION GIVEN BY THE GOVERNMENT OF WEST BENGAL UNDER SECTION 108 READ WITH SECTION 65 OF THE ELECTRICITY ACT, 2003 IN THE MATTER OF TARIFF ORDER DATED 28.07.2009 PASSED BY THE COMMISSION FOR THE YEAR 2009-2010 IN RESPECT OF THE DURGAPUR PROJECTS LIMITED IN CASE NO. TP-38/08-09
|
304 |
WBPDCL |
FPPCA – 35 / 09 – 10 |
Wednesday, November 25, 2009 |
2009-2010 |
APPLICATIONS OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR AD HOC INCREASE OF THE FUEL COST INBUILT IN THE EXISTING TARIFF FOR THE YEAR 2009- 2010 IN ACCORDANCE WITH REGULATION 2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED
|
305 |
WBSEDCL |
FPPCA – 37 / 09 – 10 |
Wednesday, November 25, 2009 |
2009-2010 |
APPLICATIONS OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ADHOC INCREASE OF THE POWER PURCHASE COST INBUILT IN THE EXISTING TARIFF FOR THE YEAR 2009-2010 IN ACCORDANCE WITH REGULATION 2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION(TERMS AND CONDITIONS OF TARIFF) REGULATIONS,2007, AS AMENDED.
|
306 |
CESC Ltd |
FPPCA – 36 / 09 – 10 |
Wednesday, November 25, 2009 |
2009-2010 |
APPLICATIONS OF CESC LIMITED FOR AD HOC INCREASE OF THE FUEL AND POWER PURCHASE COST INBUILT IN THE EXISTING TARIFF FOR THE YEAR 2009- 2010 IN ACCORDANCE WITH REGULATION 2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED.
|
307 |
IPCL |
FPPCA – 33 / 09 – 10 |
Wednesday, November 25, 2009 |
2009-2010 |
APPLICATIONS OF DPSC LTD FOR AD HOC INCREASE OF THE FUEL AND POWER PURCHASE COSTS INBUILT IN THE EXISTING TARIFF FOR THE YEAR 2009- 2010 IN ACCORDANCE WITH REGULATION 2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED.
|
308 |
DPL |
FPPCA – 39 / 09 – 10 |
Wednesday, November 25, 2009 |
2009-2010 |
APPLICATIONS OF THE DURGAPUR PROJECTS LTD FOR AD HOC INCREASE OF THE FUEL COST INBUILT IN THE EXISTING TARIFF FOR THE YEAR 2009- 2010 IN ACCORDANCE WITH REGULATION 2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS,2007, AS AMENDED.
|
309 |
DPL |
TP-38/08-09 |
Thursday, September 17, 2009 |
2009-2010 |
DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECT LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2009-10 UNDER SECTION 62 (I) (C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE-4 TO THE WEST BENGAL ELECTERICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007.
|
310 |
WBSEDCL |
TP – 41/ 08 – 09 |
Thursday, September 17, 2009 |
2009-2010 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2009 – 2010 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007
|
311 |
CESC Ltd |
TP – 37/ 08 – 09 |
Thursday, September 17, 2009 |
2009-2010 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2009 – 2010 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS)REGULATIONS, 2007.
|
312 |
IPCL |
TP – 40/ 08 – 09 |
Thursday, September 17, 2009 |
2009-2010 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2009 - 2010 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS)REGULATIONS, 2007.
|
313 |
WBSEDCL |
TP – 41 / 08 – 09 |
Tuesday, July 28, 2009 |
2009-2010 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
314 |
WBSETCL |
TP – 36 / 08 - 09 |
Tuesday, July 28, 2009 |
2009-2010 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
315 |
CESC Ltd |
TP – 37 / 08 - 09 |
Tuesday, July 28, 2009 |
2009-2010 |
THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2008-09, 2009-2010 and 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
316 |
IPCL |
TP – 40 / 08 – 09 |
Tuesday, July 28, 2009 |
2009-2010 |
THE TARIFF APPLICATION OF DPSC LIMITED FOR THE YEARS 2008 – 09, 2009 – 10 AND 2010 – 11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
317 |
WBPDCL |
TP – 39 / 08 – 09 |
Tuesday, July 28, 2009 |
2009-2010 |
THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
318 |
WBSEDCL |
APR-11/08-09 |
Thursday, May 28, 2009 |
2007-2008 |
THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2007 – 2008 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
319 |
WBSETCL |
APR-10/08-09 |
Thursday, May 28, 2009 |
2007-2008 |
THE APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2007 – 2008 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED
|
320 |
CESC Ltd |
APR – 7/ 08 – 09 |
Thursday, May 28, 2009 |
2007-2008 |
THE APPLICATION OF CESC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2007-08 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION(TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED
|
321 |
IPCL |
APR-6/08-09 |
Thursday, May 28, 2009 |
2007-2008 |
THE APPLICATION OF THE DPSC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2007 – 2008 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED
|
322 |
WBPDCL |
APR-9/08-09 |
Thursday, May 28, 2009 |
2007-2008 |
THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR ANNUAL PERFORMANCE REVIEW OF THE FINANCIAL YEAR 2007 – 2008 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED
|
323 |
DPL |
APR-8/08-09 |
Thursday, May 28, 2009 |
2007-2008 |
THE APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2007 – 2008 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED
|
324 |
WBSEDCL |
FPPCA – 31 / 08 – 09 |
Wednesday, May 27, 2009 |
2007-2008 |
APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2007- 2008 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
325 |
CESC Ltd |
FPPCA – 27 / 08 – 09 |
Wednesday, May 27, 2009 |
2007-2008 |
APPLICATION OF THE CESC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA) FOR THE FINANCIAL YEAR 2007- 2008 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
326 |
IPCL |
FPPCA – 28 / 08 – 09 |
Wednesday, May 27, 2009 |
2007-2008 |
APPLICATION OF DPSC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA) FOR THE FINANCIAL YEAR 2007- 2008 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007,AS AMENDED
|
327 |
DPL |
FPPCA – 29 / 08 – 09 |
Wednesday, May 27, 2009 |
2007-2008 |
APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2007- 2008 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007,AS AMENDED
|
328 |
WBPDCL |
FPPCA-30/08-09 |
Tuesday, April 21, 2009 |
2007-2008 |
THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR FUEL COST ADJUSTMENT (FCA) FOR THE FINANCIAL YEAR 2007 – 2008 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
329 |
SHRELCOP |
Petition for SHRELCOP |
Friday, January 9, 2009 |
2005-2006 |
Order For petition 03-04/04-05/05-06 dated 01/09/2005
|
330 |
WBSEDCL |
TP-41/08-09 |
Thursday, December 4, 2008 |
2008-2009 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED(WBSEDCL) FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE YEAR 2008-09 UNDER SECTION 62 (I) (C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE-4 TO THE WEST BENGAL ELECTERICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS,2007
|
331 |
CESC Ltd |
TP-37/08-09 |
Thursday, December 4, 2008 |
2008-2009 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LTD FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE YEAR 2008-09 UNDER SECTION 62 (I) (C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE-4 TO THE WEST BENGAL ELECTERICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007.
|
332 |
IPCL |
TP-40/ 08-09 |
Thursday, December 4, 2008 |
2008-2009 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2008-09 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE - 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007.
|
333 |
DPL |
TP-38/08-09 |
Thursday, December 4, 2008 |
2008-2009 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECT LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2008-09 UNDER SECTION 62 (I) (C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE-4 TO THE WEST BENGAL ELECTERICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007.
|
334 |
DPL |
TP-38/08-09 |
Friday, October 3, 2008 |
2009-2010 |
Corrigendum to the Tariff Order dated 26.09.2008 of the Commission in respect of Durgapur Project Limited in TP-38/08-09
|
335 |
WBSEDCL |
TP – 41 / 08 – 09 |
Tuesday, September 30, 2008 |
2008-2009 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
336 |
CESC Ltd |
TP – 37 / 08 - 09 |
Tuesday, September 30, 2008 |
2008-2009 |
THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2008-09, 2009-2010 and 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
337 |
IPCL |
TP – 40 / 08 - 09 |
Friday, September 26, 2008 |
2008-2009, 2009-2010, 2010-2011 |
IN RE THE TARIFF APPLICATION OF DPSC LIMITED FOR THE YEARS 2008-09, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
338 |
WBSEDCL |
APR-5/ 07-08 |
Friday, September 26, 2008 |
2006-2007 |
THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2006-07 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
339 |
CESC Ltd |
APR-1/ 07-08 |
Friday, September 26, 2008 |
2006-2007 |
THE APPLICATION OF CESC LIMITED FOR ANNUAL PERFORMANCE REVIEW OF THE FINANCIAL YEAR 2006-07 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION(TERMS CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
340 |
DPL |
TP – 38 / 08 - 09 |
Friday, September 26, 2008 |
2008-2009 |
THE TARIFF APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR THE YEARS 2008-09, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
341 |
WBPDCL |
TP – 39 / 08 – 09 |
Friday, September 26, 2008 |
2008-2009 |
THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
342 |
WBSETCL |
TP – 36 / 08 - 09 |
Tuesday, September 23, 2008 |
2008-2009 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
343 |
IPCL |
APR-4/ 07-08 |
Monday, September 15, 2008 |
2006-2007 |
THE APPLICATION OF DPSC LIMITED FOR THE ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2006-07 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007,AS AMMENDED.
|
344 |
WBPDCL |
APR-2/ 07-08 |
Monday, September 15, 2008 |
2006-2007 |
THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR ANNUAL PERFORMANCE REVIEW OF THE FINANCIAL YEAR 2006-07 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
345 |
DPL |
APR-3/ 07-08 |
Monday, September 15, 2008 |
2006-2007 |
THE APPLICATION OF THE DURGAPUR PROJECT LIMITED FOR ANNUAL PERFORMANCE REVIEW OF THE FINANCIAL YEAR 2006-07 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED.
|
346 |
WBSEDCL |
FPPCA – 25/ 07-08 |
Tuesday, June 3, 2008 |
2007-2008 |
APPLICATION OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR INTERIM INCREASE IN THE FUEL & POWER PURCHASE COST IN BUILT IN THE EXISTING POWER TARIFF IN ACCORDANCE WITH THE REGULATION 2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED ON 31.12.2007
|
347 |
WBSEDCL |
FPPCA – 26 / 07 – 08 |
Tuesday, June 3, 2008 |
2006-2007 |
APPLICATION OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE YEAR 2006-07 IN TERMS OF THE TARIFF ORDER DATED 08TH MAY, 2006 FOR THE YEAR 2006-07
|
348 |
DPL |
FPPCA-20/07-08 |
Wednesday, March 12, 2008 |
2006-2007 |
APPLICATION OF THE DURGAPUR PROJECTS LTD. FOR FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2006-07 IN TERMS OF THE TARIFF ORDER DATED 08.05.2006 IN CASE NO: TP-25/06-07
|
349 |
WBPDCL |
FPPCA – 23 / 07 – 08 |
Thursday, February 28, 2008 |
2007-2008 |
APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. FOR INTERIM INCREASE IN THE FUEL COST INBUILT IN THE EXISTING POWER TARIFF FOR ITS POWER STATIONS FOR THE YEAR 2007- 08 IN ACCORDANCE WITH THE REGULATION NO: 2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS.2007
|
350 |
DPL |
FPPCA – 22 / 07 – 08 |
Monday, February 25, 2008 |
2007-2008 |
APPLICATION OF THE DURGAPUR PROJECTS LTD FOR INTERIM INCREASE IN THE FUEL AND POWER PURCHASE COST INBUILT IN THE EXISTING POWER TARIFF FOR THE YEAR 2007- 08 IN ACCORDANCE WITH THE REGULATION NO: 2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATROY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED ON 31.12.2007
|