Sl. No |
Case No. |
Date |
Matter |
301. |
PPA-86/17-18 |
Thursday, June 13, 2019 |
IN THE MATTER OF APPLICATION SEEKING APPROVAL FOR POWER PURCHASE FROM THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) BY THE DURGAPUR PROJECTS LIMITED (DPL) AS AND WHEN REQUIRED.
|
302. |
WBERC/OA-275/18-19 |
Monday, June 10, 2019 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL
STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL)
FOR ISSUANCE OF ORDER TO DISTRIBUTE ACCUMULATED FUND
FROM THE UI ACCOUNT AMONGST DISTRIBUTION LICENSEES AS PER
REGULATION 6.14.5 OF THE WEST BENGAL ELECTRICITY REGULATORY
COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS,
2011, AS AMENDED. |
303. |
WBERC/OA-298 /18-19 |
Friday, June 7, 2019 |
IN REGARD · TOTHE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR ISSUANCE OF ORDER FOR CHANGE OF BILLING CYCLE OF
SOME CON.SUMER CATEGORIES OF ERSTWHILE DURGAPUR PROJECTS LIMITED (DPL) LICENSEE AREA IN VIEW OF TRANSFER OF POWER DISTRIBUTION BUSINESS OF DPL TO WBSEDCL UPON
RESTRUCTURING OF DPL WITH EFFECT FROM 01.01.2019 AS PER NOTIFICATION NO 328/PO/O/C-IV/1E-60/13 (PT-VA) DATED 26.12.2018 OF GOVERNMENT OF WEST BENGAL. |
304. |
B-11/22 |
Monday, June 3, 2019 |
IN RE EXTENSION OF TIME FOR FILING UP MULTI YEAR TARIFF PETITION FOR THE SIXTH CONTROL PERIOD |
305. |
OA-302/18-19 |
Monday, May 20, 2019 |
IN THE MATTER OF APPLICATION BY OCL BENGAL CEMENT WORKS,A UNIT OF OCL INDIA LIMITED (OCL) SEEKING CLARIFICATION ON DSM MECHANISM UNDER WBERC (OPEN ACCESS) REGULATIONS, 2007 AS URGED UPON BY SLDC, WBSETCL ON OCL'S APPLICATION FOR INTER-STATE SHORT TERM OPEN ACCESS FOR 7 MW POWER FROM OCL'S CAPTIVE POWER PLANT AT RAJGANJPUR, ODISHA TO THEIR WORKS GODAPIASAL , SALBONI , WEST MEDINIPUR AND IN THE MATTER OF OCL BENGAL CEMENT WORKS ( PETITIONER) AND WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (RESPONDENT) |
306. |
PPA-80/16-17 |
Thursday, May 16, 2019 |
IN THE MATTER OF APPLICATION REGARDING IMPLEMENTATION OF LONG TERM POWER PURCHASE AGREEMENT BETWEEN THE DURGAPUR PROJECTS LIMITED (DPL) AND WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) AND MODIFICATION IN TARIFF TO ALLOW FIXED COST BASED ON AVAILABILITY OF UNIT FOR SUPPLY OF POWER TO WBSEDCL
AND
IN THE MATTER OF THE DURGAPUR PROJECTS LIMITED (PETITIONER)
AND
WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (RESPONDENT)
|
307. |
OA-245/16-17 |
Thursday, May 2, 2019 |
IN THE MATTER OF APPLICATION FOR ISSUE OF PRACTICE DIRECTIONS TO ENABLE CONSUMERS TO OBTAIN 'NO DUES CERTIFICATE' FROM EXISTING LICENSEE PRIOR TO SWITCHING OVER I EXERCISING THE CHOICE OF OPEN ACCESS FROM ANOTHER PARALLEL LICENSEE/ SUPPLIER AND IN THE MATTER OF INDIA POWER CORPORATION LIMITED(PETITIONER) AND WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED(RESPONDENT) AND EASTERN COAL FIELDS LIMITED (RESPONDENT) |
308. |
WBERC/C-15/992 |
Thursday, May 2, 2019 |
IN THE MATTER OF ORDER ISSUED BY THE HON'BLE HIGH COURT, CALCUTTA ON 29.01.2019 IN RESPECT OF THE WRIT PETITION NO. W.P. NO. 2723 (W) OF 2018 FILED BY INDUS TOWERS LIMITED (ITL) BEFORE THE HON'BLE HIGH COURT AT CALCUTTA WITH A PRAYER TO INTER-ALIA WITHDRAW, RECALL, RESCIND AND/OR CANCEL THE THREAT OF DISCONNECTION NOTICE DATED 2ND FEBRUARY, 2018 ISSUED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL). |
309. |
WBERC/OA-262/17-18 |
Tuesday, April 16, 2019 |
IN REGARD TO THE APPLICATION SUBMITTED BY INDIA POWER CORPORATION LIMITED (IPCL) FOR APPROVAL OF CAPITAL INVESTMENT PROPOSAL FOR IMPLEMENTATION OF SCADA SYSTEM AT IPCL'S DISTRIBUTION AREA COVERING 220/33 KV J K NAGAR SUB-STATION AND ITS 9 NOS. 33/11 KV DOWNSTREAM SUBSTATIONS IN TERMS OF REGULATION 2.8.4.1 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011, AS AMENDED |
310. |
PPA-95 /18-19 |
Friday, April 5, 2019 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR APPROVAL OF POWER PURCHASE AGREEMENT
EXECUTED ON 25.01.2019 BY AND BETWEEN THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) AND THE DAMODAR VALLEY CORPORATION (DVC) FOR PURCHASE OF 204 MW POWER FROM RAGHUNATHPUR THERMAL POWER STATION, PHASE - I BY WBSEDCL, FOR A PERIOD OF THREE YEARS FROM THE DATE OF COMMENCEMENT OF SUPPLY AT THE REGULATED PRICE DETERMINED BY CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) IN TERMS OF REGULATIONS 7.8.1, 7.8.2 AND 7.8.3 OF THE WEST BENGAL ELECTRICITY
REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011, AS AMENDED. |
311. |
OA-248/16-17 |
Monday, April 1, 2019 |
IN REGARD TO AN APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD FOR INVESTMENT APPROVAL FOR AN ESTIMATED COST OF RS. 278.72
CRORE TO IMPLEMENT THE INTEGRATED POWER DEVELOPMENT SCHEME COVERING 13 NOS. OF TOWNS IN 2 (TWO) REGIONS IN THE STATE OF WEST BENGAL IN TERMS OF REGULATION 2.8.2.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011, AS AMENDED. |
312. |
OA-236/16-17 |
Tuesday, March 5, 2019 |
IN REGARD TO THE PETITION SUBMITTED BY WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (WBSETCL) FOR APPROVAL OF CAPITAL EXPENDITURE OF RS. 422.65 CRORE FOR IMPLEMENTATION OF 4 NOS. OF TRANSMISSION SCHEMES IN TERMS OF REGULATION 2.8.2.3 AND PARAGRAPH 4.1 (VI) OF SCHEDULE-2 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS,2011, AS AMENDED FROM TIME TO TIME. |
313. |
OA-272/18-19-CORRIGENDUM |
Tuesday, March 5, 2019 |
CORRIGENDUM TO THE ORDER DATED 01.03.2019 OF THE COMMISSION IN CASE NO. OA-272/18-19 IN THE MATTER OF INDIA POWER CORPORATION LIMITED (IPCL)-VS - DAMODAR VALLEY ORPORATION (DVC) IN REGARD TO ENERGY COST FOR SUPPLY OF ENERGY IN RADIAL MODE BY DVC AT DIFFERENT RADIAL OFF-TAKE POINT OF IPCL |
314. |
OA-272/18-19 |
Friday, March 1, 2019 |
IN REGARD TO THE APPLICATION SUBMTTED BY INDIAN POWER CORPORATION UMTED (IPCL) ON 25.04.2018 SEEKING DIRECTION IN ORDER TO RESOLVE THE ISSUE OF ENERGY COST FOR SUPPLY OF ENERGY IN RADIAL MODE BY DVC AT DIFFERENT RADIAL OFF-TAKE POINTS OF WBSEDCL |
315. |
OA-273/18-19 |
Friday, March 1, 2019 |
IN REGARD TO THE APPLICATION SUBMTTED BY THE VVEST BENGAL ELECTRIOlY DISTRIBUTION COMPANY UMTED (WBSEDCL) ON 14.05.2018 SEEKING DIRECTION IN ORDER TO RESOLVE THE ISSUE OF ENERGY COST FOR SUPPLY OF ENERGY IN RADIAL MODE BY DVC AT DIFFERENT RADIAL OFF-TAKE POINTS OF WBSEDCL |
316. |
OA-300/18-19 |
Friday, March 1, 2019 |
IN REGARD TO THE APPLICATION SUBMITTED BY DAMODAR VALLEY CORPORATION ON 13.02.2019 IN TERMS OF THE DIRECTNE OF THE HON'BLE APPELLATE TRIBUNAL FOR ELECTRICITY IN THE ORDER DATED 31.01.2019 |
317. |
WBERC/OA-151/12-13 |
Thursday, February 28, 2019 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR APPROVAL OF THE MODIFIED DRAFT STANDARD AGREEMENT TO BE EXECUTED BY WBSEDCL WITH DIFFERENT CONSUMERS INTENDING TO INSTALL ROOF TOP SOLAR PV PANELS AS PER REGULATION 6.1 (V) (c) OF WEST BENGAL ELECTRICITY REGULATORY COMMISSION (COGENERATION AND GENERATION OF ELECTRICITY FROM RENEWABLE SOURCES OF ENERGY) REGULATIONS, 2013 |
318. |
OA-273/18-19 |
Thursday, February 21, 2019 |
APPLICATION REGARDING ADJUDICATION OF DISPUTE ON ACCOUNT OF ERRONEOUS BILLING BY DAMODAR VALLEY CORPORATION AT RETAIL SUPPLY TARIFF TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED IN CONTRARY TO THE PROVISIONS OF ELECTRICITY ACT, 2003. |
319. |
OA-272/18-19 |
Thursday, February 21, 2019 |
APPLICATION REGARDING ADJUDICATION OF DISPUTE ON ACCOUNT OF ERRONEOUS BILLING BY DAMODAR VALLEY CORPORATION AT RETAIL SUPPLY TARIFF TO INDIA POWER CORPORATION LIMITED IN CONTRARY TO THE PROVISIONS OF THE ELECTRICITY ACT, 2003. |
320. |
OA-268/17-18 |
Wednesday, February 20, 2019 |
APPLICATION UNDER SECTION 86(1 )(F) OF THE ELECTRICITY ACT, 2003 FOR DIRECTION UPON WBSEDCL (RESPONDENT) TO PAY RS. 253.18 LAKH ALONG WITH THE INTEREST @1.25% TO NIPPON POWER LIMITED (PETITIONER). |
321. |
OA-245/16-17 |
Wednesday, February 20, 2019 |
APPLICATION FOR ISSUE OF PRACTICE DIRECTIONS TO ENABLE CONSUMERS TO OBTAIN 'NO DUES CERTIFICATE' FROM EXISTING LICENSEE PRIOR TO SWITCHING OVER/ EXERCISING THE CHOICE OF OPEN ACCESS FROM ANOTHER PARALLEL LICENSEE I SUPPLIER. |
322. |
WBERC/PPA-94 /18-19 |
Friday, February 15, 2019 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR APPROVAL OF POWER PURCHASE AGREEMENT EXECUTED ON 08.01.2019 BETWEEN TATA POWER TRADING COMPANY LIMITED (TPTCL) AND THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR PURCHASE OF HYDRO ELECTRIC POWER BY WBSEDCL FROM THE DAGACHHU HYDRO POWER CORPORATION LIMITED, A COMPANY DULY INCORPORATED UNDER THE LAWS OF BHUTAN, FROM THE DATE OF SUPPLY OF POWER TO 28TH, FEBRUARY.2023 THROUGH TPTCL IN TERMS OF REGULATIONS 2.1.5(1), 7.4.1 AND 7.8.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011, AS AMENDED. |
323. |
B-11/22 |
Monday, February 4, 2019 |
IN RE EXTENSION OF TIME FOR FILING MULTl YEAR TARIFF PETITION FOR THE SIXTH CONTROL PERIOD |
324. |
B-11/22 |
Friday, February 1, 2019 |
IN RE EXTENSION OF TIME FOR FILING ANNUAL PERFORMANCE REVIEW BY WBPDCL FOR THE YEAR 2017-18 |
325. |
WBERC/B-11/22 |
Friday, February 1, 2019 |
IN REGARD TO THE PRAYER OF DIFFERENT CONSUMERS OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) BEFORE THE COMMISSION TO PASS AN APPROPRIATE ORDER IN THE MATTER OF (I) STATUS OF RAILWAYS AS DEEMED LICENSEE IN THE STATE (II) FINANCIAL BURDEN OF SURPLUS CONTRACTED POWER, LOSS OF REVENUE SHARING AND (Ill) APR
BURDEN OF UNSETTLED ORDERS DUE TO OPEN ACCESS OF RAILWAYS AND SUBMISSIONS AND PRAYERS OF WBSEDCL |
326. |
WBERC/PPA-92 /18-19 |
Friday, February 1, 2019 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR APPROVAL OF POWER PURCHASE AGREEMENT EXECUTED ON 29.10.2018 BETWEEN PTC INDIA LIMITED (PTC) AND WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR PURCHASE OF 100 MW POWER FROM JAi PRAKASH POWER VENTURES LIMITED FROM APPOINTED DATE FOR A PERIOD OF 3 (THREE) YEARS IN TERMS OF REGULATIONS 2.1.3, 7.4.1 AND 7.8.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011, AS AMENDED. |
327. |
WBERC/PPA-91 /18-19 |
Friday, February 1, 2019 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR APPROVAL OF POWER PURCHASE AGREEMENT EXECUTED ON 29.10.2018 BETWEEN PTC INDIA LIMITED (PTC) AND WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR PURCHASE OF 100 MW POWER FROM JHABUA POWER LIMITED FROM APPOINTED DATE FOR A PERIOD OF 3 (THREE) YEARS IN TERMS OF REGULATIONS 2.1.3, 7.4.1 AND 7.8.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND
CONDITIONS OF TARIFF) REGULATIONS, 2011, AS AMENDED. |
328. |
OA-277/18-19 |
Tuesday, January 22, 2019 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR ISSUANCE OF APPROPRIATE ORDER FOR PROVISION OF
INSTALLATION OF SINGLE PHASE EXPORT- IMPORT TYPE METER FOR NET METERING PURPOSE FOR REMOVAL OF DIFFICULTIES. |
329. |
A-6/14 |
Monday, December 31, 2018 |
IN REGARD TO THE DIRECTION OF THE GOVERNMENT OF WEST BENGAL IN THE DEPARTMENT OF POWER & NES UNDER SECTION 108 OF THE ELECTRICITY ACT, 2003 FOR TRANSFER OF DISTRIBUTION AND TRANSMISSION FUNCTIONS OF THE DURGAPUR PROJECTS LIMITED (DPL) TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) AND WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (WBSETCL) UPON RESTRUCTURING OF DPL IN TERMS OF NOTIFICATIONS NO. 319/PO/O/C-IV/1E-60/13 (PART-VA) DATED 08.12.2017, 328/PO/O/C-IV/1E-60/13 (PT-VA) DATED 26.12.2018 AND 332-PO/O/C-IV/IE-60/13(PART-VA) DATED 31.12.2018. |
330. |
OA-286/18-19 |
Thursday, December 27, 2018 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR ISSUANCE OF ORDER FOR CANCELLATION OF PENDING APPLICATION FOR NEW CONNECTION DUE TO NON-COMPLETION OF SERVICE CONNECTION WORK BY THE APPLICANT ON TURNKEY BASIS UNDER REMOVAL OF DIFFICULTIES |