| Sl. No |
Case No. |
Date |
Matter |
| 1. |
PPA-151/25-26 |
Thursday, April 2, 2026 |
POWER PURCHASE AGREEMENT EXECUTED ON 19.12.2025 BY AND BETWEEN WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) & MAHALAXMI ENNORE COKE AND POWER PRIVATE LIMITED (MECPPL) FOR PURCHASE OF 12 MW POWER FROM THE 12 MW WASTE HEAT RECOVERY BOILER (WHRB) PLANT OF MECPPL. |
| 2. |
OA-553/25-26 |
Thursday, March 5, 2026 |
APPROVAL OF THE DEVIATIONS FROM THE MODEL BIDDING DOCUMENTS AS PER THE MINISTRY OF POWER GUIDELINES DATED 06.03.2019 FOR PROCUREMENT OF 800 MW POWER UNDER LONG TERM FORM THIRD GREENFIELD POWER STATION OF 1 X 800 MW TO BE SET UP ON DESIGN, BUILD, FINANCE, OWN AND OPERATE (DBFOO) MODEL |
| 3. |
PPA-150/25-26 |
Tuesday, February 17, 2026 |
POWER SUPPLY AGREEMENT (PSA) DATED 20.01.2026 FOR CONTRACTED CAPACITY OF 1508 MW TO BE PURCHASED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) UNDER LONG TERM ARRANGEMENT FROM NEW POWER STATION OF 2 X 800 MW TO BE SETUP BY JSW THERMAL ENERGY TWO LIMITED (JSW TETL) DESIGN, BUILD, FINANCE, OWN AND OPERATE (DBFOO) MODEL |
| 4. |
OA-550/25-26 |
Thursday, February 12, 2026 |
ADOPTION OF TARIFF DISCOVERED UNDER TARIFF BASED COMPETITIVE BIDDING PROCESS UNDER SECTION 63 OF THE ELECTRICITY ACT, 2003 FOR A CONTRACTED CAPACITY OF 1508 MW POWER TO BE PURCHASED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FROM SECOND GREENFIELD THERMAL POWER PROJECT OF 2 X 800 MW (1600MW) INSTALLED CAPACITY TO BE SET UP ON DESIGN, BUILD, FINANCE, OWN AND OPERATE (DBFOO) MODEL |
| 5. |
PPA-149/25-26 |
Wednesday, January 21, 2026 |
APPROVAL OF POWER PURCHASE AGREEMENT EXECUTED ON 19.12.2025 BY AND BETWEEN WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) AND RASHMI METALIKS LIMITED (RML) FOR PROCUREMENT OF SURPLUS POWER OF 3 MW FROM THE POWER PLANT OF RML |
| 6. |
PPA-147/25-26 |
Tuesday, December 23, 2025 |
APPROVAL OF POWER SALE AGREEMENT EXECUTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED WITH SOLAR ENERGY CORPORATION OF INDIA LIMITED FOR PURCHASE OF 100 MW OF SOLAR POWER |
| 7. |
OA-539/25-26 |
Friday, November 14, 2025 |
APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED UNDER SECTION 86(1)(B) AND SECTION 63 OF THE ELECTRICITY ACT, 2003 FOR APPROVAL OF DEVIATIONS FROM MODEL BIDDING DOCUMENTS AS PER MINISTRY OF POWER GUIDELINES DATED 06.03.2019 TO SET UP 1600 MW ( 2 X 800 MW) POWER PLANT ON DESIGN, BUILD, FINANCE, OWN AND OPERATE (DBFOO) MODEL |
| 8. |
OA-534/25-26 |
Tuesday, November 11, 2025 |
APPROVAL IF THE EXEMPTION SOUGHT FOR THE IMPLEMENTATION OF PROCEDURE OF GRID INTERACTIVE ROOFTOP SOLAR PHOTOVOLTAIC SYSTEM UNDER NET-METERING/NET-BILLING/GROSS-METERING ARRANGEMENT (WBSEDCL PROCEDURE-C(2025)) |
| 9. |
PPA-144/25-26 |
Thursday, September 25, 2025 |
APPROVAL OF POWER PURCHASE AGREEMENT OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED WITH RATLE HYDRO ELECTRIC POWER CORPORATION LIMITED FOR PROCUREMENT OF HYDRO POWER FROM RATLE HYDRO ELECTRIC PROJECT |
| 10. |
PPA-74 (VOL.V)/14-15 |
Wednesday, September 24, 2025 |
APPROVAL OF FIFTH SUPPLEMENTARY AGREEMENT TO POWER PURCHASE AGREEMENT DATED 11.12.201O EXECUTED BY AND BETWEEN M/S BENGAL ENERGY LIMITED (BEL) AND WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR A PERIOD OF FIVE YEARS |
| 11. |
OA-529/25-26 |
Monday, September 1, 2025 |
PETITION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED UNDER SECTION 86 (1) (B) READ WITH SECTION 63 OF THE ELECTRICITY ACT, 2003 SEEKING APPROVAL OF THE DEVIATIONS FROM THE MODEL BIDDING DOCUMENTS AS PER THE MINISTRY OF POWER GUIDELINES DATED 06.03.2019 AND THE DEVIATIONS APPROVED BY THE COMMISSION IN THE ORDER DATED 06.05.2025 IN CASE NO. OA-514/24-25 FOR PROCUREMENT OF 660 MW POWER UNDER LONG TERM FROM A NEW POWER STATION OF 1 X 660 MW TO BE SET UP ON DESIGN, BUILD, FINANCE, OWN AND OPERATE (DBFOO) MODEL IN THE EXISTING PLANT PREMISES OF THE DURGAPUR PROJECTS LIMITED |
| 12. |
OA-527/25-26 |
Wednesday, August 20, 2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED UNDER SECTION 86 (1) (B) READ WITH SECTION 63 OF THE ELECTRICITY ACT, 2003 FOR SEEKING APPROVAL OF THE DEVIATIONS FROM THE MODEL BIDDING DOCUMENTS AS PER THE MINISTRY OF POWER GUIDELINES DATED 06.03.2019 FOR PROCUREMENT OF 1600 MW POWER UNDER LONG TERM FROM SECOND GREEN FIELD POWER STATION OF 2 X 800 MW TO BE SET UP ON DESIGN, BUILD, FINANCE, OWN AND OPERATE (DBFOO) MODEL |
| 13. |
PPA-140/25-26 |
Monday, August 4, 2025 |
APPROVAL OF POWER PURCHASE AGREEMENT EXECUTED ON 28.03.2025 BY AND BETWEEN WBSEDCL AND NHPC FOR PURCHASE OF 69 MW HYDRO POWER FROM THE NHPC POWER STATION AT PARBATI-II HE PROJECT 800 MW (4 X 200 MW) AT P.O. NAGWAIN, DISTRICT MANDI, HIMACHAL PRADESH IN TERMS OF REGULATION 7.4 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011 AS AMENDED. |
| 14. |
PPA-139/25-26 |
Friday, August 1, 2025 |
APPROVAL OF POWER PURCHASE AGREEMENT EXECUTED ON 28.03.2025 BY AND BETWEEN WBSEDCL AND NHPC FOR PURCHASE OF 29 MW HYDRO POWER FROM THE NHPC POWER STATION AT TEESTA-VI HE PROJECT 500 MW (4 X 125 MW) AT SOUTH SIKKIM, SIKKIM IN TERMS OF REGULATION 7.4 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011AS AMENDED. |
| 15. |
OA-461/23-24 |
Tuesday, July 22, 2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR APPROVAL OF THE VALUE OF THE PARAMETER "COST RECOVERED THROUGH DEMAND CHARGES FROM ALL CONSUMERS" IN RESPECT OF TARIFF ORDER FOR THE YEARS 2023-24, 2024-25 AND 2025-26 OF WBSEDCL COMPUTATION OF ADDITIONAL SURCHARGE AS PER CLAUSE 18.2.5(B) OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2022. |
| 16. |
OA-427/22-23 |
Tuesday, July 22, 2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR APPROVAL OF THIRD PHASE INVESTMENT APPROVAL FOR DISTRIBUTION NETWORK STRENGTHENING SCHEME AND GRID MODERNIZATION WITH HIGH VOLTAGE DISTRIBUTION SYSTEM, LOW TENSION AERIAL BUNDLE CABLING, UNDERGROUND CABLING, CONSTRUCTION OF 33/11 KV GIS, CREATION OF IT BACKBONE FOR AMI AND SCADA IN TERMS OF REGULATION 2.8.2.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011, AS AMENDED FROM TIME TO TIME |
| 17. |
OA-493/24-25 |
Friday, July 11, 2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRBUTION COMPANY LIMITED FOR PRIOR APPROVAL OF PERLIMINARY EXPENDITURE ON ACCOUNT OF EXPLORATORY WORKS FOR PREPARATION OF DETAILED PROJECT REPORT INCLUDING SURVEY AND INVESTIGATION WORKS I.R.O. BANDU PUMPED STORAGE PROJECT OF 900 MW |
| 18. |
OA-520/25-26 |
Friday, July 11, 2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR PRIOR APPROVAL OF PRELIMINARY EXPENDITURE ON ACCOUNT OF EXPLORATORY WORKS FOR PREPARATION OF RESIDUAL LIFE ASSESSMENT STUDY, PERFORMANCE ANALYSIS STUDY AND PREPARATION OF DETAILED PROJECT REPORT FOR RENOVATION AND MODERNIZATION PROGRAMME OF EXISTING MINI AND MICRO HYDRO PROJECTS OF WBSEDCL |
| 19. |
PPA-29/10-11 |
Friday, July 11, 2025 |
APPLICATION FOR APPROVAL OF SUPPLEMENTARY POWER PURCHASE AGREEMENT (PPA) EXECUTED ON 31.12.2024 BY AND BETWEEN NTPC LIMITED & WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED TO THE PRINCIPLE POWER PURCHASE AGREEMENT EXECUTED ON 04.01.2011 FOR PURCHASE OF POWER BY WBSEDCL FROM THE POWER PLANT OF NABINAGAR SUPER THERMAL POWER PROJECT, STAGE-II OF NTPC LIMITED (PREVIOUSLY OWNED BY NABINAGAR POWER GENERATING COMPANY PRIVATE LIMITED) AT REGULATED PRICE WITH CONTRACT PERIOD OF 25 ( TWENTY FIVE) YEARS IN TERMS OF REGULATION 7.4 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ( TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011 AS AMENDED. |
| 20. |
PPA-137/24-25 |
Thursday, May 29, 2025 |
APPLICATION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) IN TERMS OF SECTION 63 READ WITH SECTION 86(1)(b) OF THE ELECTRICITY ACT, 2003 FOR APPROVAL OF THE POWER SUPPLY AGREEMENT (PSA) EXECUTED ON 13.03.2025 BETWEEN JSW THERMAL ENERGY LIMITED AND WBSEDCL FOR CONTRACTED CAPACITY OF 1492 MW UNDER LONG TERM ARRANGEMENT FROM NEW POWER STATTION OF 2 X 800 MW TO BE SET UP ON DESIGN, BUILD, FINANCE, OWN AND OPERATE (DBFOO) MODEL |
| 21. |
OA-513/24-25 |
Wednesday, May 28, 2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED UNDER SECTION 63 READ WITH SECTION 86(1) (B) OF THE ELECTRICITY ACT, 2003 FOR ADOPTION OF TARIFF DISCOVERED UNDER TARIFF BASED COMPETITIVE BIDDING PROCESS FOR A CONTRACTED CAPACITY OF 1492 MW POWER UNDER LONG TERM FROM NEW GREENFIELD POWER PLANT OF 2 X 800 MW (1600 MW) INSTALLED CAPACITY TO BE SET UP ON DESIGN,BUILD,FINANCE,OWN AND OPERATE (DBFOO) MODEL |
| 22. |
PPA-31/10-11 |
Thursday, May 15, 2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR APPROVAL OF SUPPLEMENTARY AGREEMENT EXECUTED ON 02.09.2021 TO THE POWER PURCHASE AGREEMENT DATED 17.06.2005 (PRINCIPAL AGREEMENT) EXECUTED BY AND BETWEEN NHPC LIMITED AND WBSEDCL FOR PURCHASE OF ENTIRE POWER FROM 160 MW TEESTA LOW DAM – IV POWER PROJECT OF NHPC LIMITED AT DARJEELING, WEST BENGAL FOR THE PERIOD FROM 01.04.2021 TO 31.03.2031 IN TERMS OF REGULATION 7.4.1 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011 AS AMENDED.
|
| 23. |
OA-514/24-25 |
Tuesday, May 6, 2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED UNDER SECTION 86 (1) READ WITH SECTION 63 OF THE ELECTRICITY ACT, 2003 FOR SEEKING APPROVAL OF THE DEVIATIONS FROM THE MODEL REQUEST FOR PROPOSAL AND MODEL POWER SUPPLY AGREEMENT AS PER THE MINISTRY OF POWER GUIDELINES DATED 06.03.2019 FOR PROCUREMENT OF 660 MW POWER UNDER LONG TERM FROM A NEW POWER STATIONS OF 1 X 660 MW TO BE SET UP ON DESIGN, BUILD, FINANCE, OWN AND OPERATE (DBFOO) IN THE EXISTING PLANT PREMISES OF THE DURGAPUR PROJECTS LIMITED |
| 24. |
OA-511/24-25 |
Tuesday, May 6, 2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED UNDER SECTION 86 (1) READ WITH SECTION 63 OF THE ELECTRICITY ACT, 2003 FOR SEEKING APPROVAL OF THE DEVIATIONS FROM THE MODEL BIDDING DOCUMENTS AS PER THE MINISTRY OF POWER GUIDELINES DATED 06.03.2019 FOR PROCUREMENT OF 660 MW POWER UNDER LONG TERM FROM A NEW BROWN FIELD POWER STATION TO BE SET UP ON DESIGN, BUILD, FINANCE, OWN AND OPERATE (DBFOO) AT THE EXISTING SURPLUS LAND OF 1050 MW POWER PLANT FACILITY OF BAKRESWAR THERMAL POWER STATION OWNED BY THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED |
| 25. |
OA-510/24-25 |
Tuesday, May 6, 2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED UNDER SECTION 86 (1) READ WITH SECTION 63 OF THE ELECTRICITY ACT, 2003 FOR SEEKING APPROVAL OF THE DEVIATIONS FROM THE MODEL BIDDING DOCUMENTS AS PER THE MINISTRY OF POWER GUIDELINES DATED 06.03.2019 FOR PROCUREMENT OF 1600 MW POWER UNDER LONG TERM FROM A NEW BROWN FIELD POWER STATION TO BE SET UP ON DESIGN, BUILD, FINANCE, OWN AND OPERATE (DBFOO) AT THE EXISTING SURPLUS LAND OF 500 MW POWER PLANT FACILITY OF SANTALDIH THERMAL POWER STATION OWNED BY THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED |
| 26. |
PPA-136/24-25 |
Tuesday, April 22, 2025 |
APPLICATION FOR APPROVAL OF THE POWER PURCHASE AGREEMENT (PPA) EXECUTED ON 12.02.2025 BY AND BETWEEN WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) AND ORISSA METALIKS PRIVATE LIMITED (OMPL) FOR PROCUREMENT OF SURPLUS POWER OF 5 MW FROM THE POWER PLANT OF OMPL |
| 27. |
PPA-135/24-25 |
Tuesday, April 22, 2025 |
APPLICATION FOR APPROVAL OF THE POWER PURCHASE AGREEMENT (PPA) EXECUTED ON 05.02.2025 BY AND BETWEEN WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) AND ORISSA STEEL & POWER PRIVATE LIMITED (OSPPL) FOR PROCUREMENT OF SURPLUS POWER OF 5 MW FROM THE POWER PLANT OF OSPPL |
| 28. |
PPA-134/24-25 |
Tuesday, April 22, 2025 |
APPLICATION FOR APPROVAL OF THE POWER PURCHASE AGREEMENT (PPA) EXECUTED ON 12.02.2025 BY AND BETWEEN WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) AND ORISSA ALLOY STEEL PRIVATE LIMITED (OASPL) FOR PROCUREMENT OF SURPLUS POWER OF 5 MW FROM THE POWER PLANT OF OASPL |
| 29. |
OA-504/24-25 |
Friday, February 28, 2025 |
PETITION UNDER SECTION 86 OF THE ELECTRICITY ACT, 2003 READ WITH REGULATIONS 2.4 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013, SEEKING DIRECTIONS FOR GRANT OF OPEN ACCESS BY PHILIPS CARBON BLACK LIMITED (PCBL) FOR CONVEYANCE AND TRANSMISSION TRANSMISSION OF POWER FROM THE AB ZONE SUBSTATION |
| 30. |
OA-506/24-25 |
Monday, January 6, 2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED UNDER SECTION 86 (1) READ WITH SECTION 63 OF THE ELECTRICITY ACT, 2003 FOR SEEKING APPROVAL OF THE DEVIATIONS FROM THE MODEL REQUEST FOR PROPOSAL AND MODEL POWER SUPPLY AGREEMENT OF THE MINISTRY OF POWER, GOVERNMENT OF INDIA READ WITH THE DEIVATIONS APPROVED BY THE COMMISSION VIDE ORDER DATED 26.11.2024 IN CASE NO. OA -
503 / 24 - 25 FOR PROCUREMENT OF 1600 MW POWER UNDER
LONG TERM FROM A NEW POWER STATIONS OF 2 X 800 MW TO
BE SET UP ON DESIGN, BUILD, FINANCE, OWN AND OPERATE
(DBFOO) IN THE STATE OF WEST BENGAL. |