301 |
IPCL |
FPPCA – 28 / 08 – 09 |
Wednesday, May 27, 2009 |
2007-2008 |
APPLICATION OF DPSC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA) FOR THE FINANCIAL YEAR 2007- 2008 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007,AS AMENDED
|
302 |
DPL |
FPPCA – 29 / 08 – 09 |
Wednesday, May 27, 2009 |
2007-2008 |
APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2007- 2008 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007,AS AMENDED
|
303 |
WBPDCL |
FPPCA-30/08-09 |
Tuesday, April 21, 2009 |
2007-2008 |
THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR FUEL COST ADJUSTMENT (FCA) FOR THE FINANCIAL YEAR 2007 – 2008 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
304 |
SHRELCOP |
Petition for SHRELCOP |
Friday, January 9, 2009 |
2005-2006 |
Order For petition 03-04/04-05/05-06 dated 01/09/2005
|
305 |
DPL |
TP-38/08-09 |
Thursday, December 4, 2008 |
2009-2010 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECT LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2008-09 UNDER SECTION 62 (I) (C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE-4 TO THE WEST BENGAL ELECTERICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007.
|
306 |
WBSEDCL |
TP-41/08-09 |
Thursday, December 4, 2008 |
2008-2009 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED(WBSEDCL) FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE YEAR 2008-09 UNDER SECTION 62 (I) (C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE-4 TO THE WEST BENGAL ELECTERICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS,2007
|
307 |
CESC Ltd |
TP-37/08-09 |
Thursday, December 4, 2008 |
2008-2009 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LTD FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE YEAR 2008-09 UNDER SECTION 62 (I) (C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE-4 TO THE WEST BENGAL ELECTERICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007.
|
308 |
IPCL |
TP-40/ 08-09 |
Thursday, December 4, 2008 |
2008-2009 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2008-09 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE - 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007.
|
309 |
DPL |
TP-38/08-09 |
Thursday, December 4, 2008 |
2008-2009 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECT LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2008-09 UNDER SECTION 62 (I) (C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE-4 TO THE WEST BENGAL ELECTERICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007.
|
310 |
DPL |
TP-38/08-09 |
Friday, October 3, 2008 |
2009-2010 |
Corrigendum to the Tariff Order dated 26.09.2008 of the Commission in respect of Durgapur Project Limited in TP-38/08-09
|
311 |
WBSEDCL |
TP – 41 / 08 – 09 |
Tuesday, September 30, 2008 |
2008-2009 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
312 |
CESC Ltd |
TP – 37 / 08 - 09 |
Tuesday, September 30, 2008 |
2008-2009 |
THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2008-09, 2009-2010 and 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
313 |
IPCL |
TP – 40 / 08 - 09 |
Friday, September 26, 2008 |
2008-2009, 2009-2010, 2010-2011 |
IN RE THE TARIFF APPLICATION OF DPSC LIMITED FOR THE YEARS 2008-09, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
314 |
WBSEDCL |
APR-5/ 07-08 |
Friday, September 26, 2008 |
2006-2007 |
THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2006-07 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
315 |
CESC Ltd |
APR-1/ 07-08 |
Friday, September 26, 2008 |
2006-2007 |
THE APPLICATION OF CESC LIMITED FOR ANNUAL PERFORMANCE REVIEW OF THE FINANCIAL YEAR 2006-07 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION(TERMS CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
316 |
DPL |
TP – 38 / 08 - 09 |
Friday, September 26, 2008 |
2008-2009 |
THE TARIFF APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR THE YEARS 2008-09, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
317 |
WBPDCL |
TP – 39 / 08 – 09 |
Friday, September 26, 2008 |
2008-2009 |
THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
318 |
WBSETCL |
TP – 36 / 08 - 09 |
Tuesday, September 23, 2008 |
2008-2009 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
319 |
IPCL |
APR-4/ 07-08 |
Monday, September 15, 2008 |
2006-2007 |
THE APPLICATION OF DPSC LIMITED FOR THE ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2006-07 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007,AS AMMENDED.
|
320 |
WBPDCL |
APR-2/ 07-08 |
Monday, September 15, 2008 |
2006-2007 |
THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR ANNUAL PERFORMANCE REVIEW OF THE FINANCIAL YEAR 2006-07 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
321 |
DPL |
APR-3/ 07-08 |
Monday, September 15, 2008 |
2006-2007 |
THE APPLICATION OF THE DURGAPUR PROJECT LIMITED FOR ANNUAL PERFORMANCE REVIEW OF THE FINANCIAL YEAR 2006-07 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED.
|
322 |
WBSEDCL |
FPPCA – 25/ 07-08 |
Tuesday, June 3, 2008 |
2007-2008 |
APPLICATION OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR INTERIM INCREASE IN THE FUEL & POWER PURCHASE COST IN BUILT IN THE EXISTING POWER TARIFF IN ACCORDANCE WITH THE REGULATION 2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED ON 31.12.2007
|
323 |
WBSEDCL |
FPPCA – 26 / 07 – 08 |
Tuesday, June 3, 2008 |
2006-2007 |
APPLICATION OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE YEAR 2006-07 IN TERMS OF THE TARIFF ORDER DATED 08TH MAY, 2006 FOR THE YEAR 2006-07
|
324 |
DPL |
FPPCA-20/07-08 |
Wednesday, March 12, 2008 |
2006-2007 |
APPLICATION OF THE DURGAPUR PROJECTS LTD. FOR FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2006-07 IN TERMS OF THE TARIFF ORDER DATED 08.05.2006 IN CASE NO: TP-25/06-07
|
325 |
WBPDCL |
FPPCA – 23 / 07 – 08 |
Thursday, February 28, 2008 |
2007-2008 |
APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. FOR INTERIM INCREASE IN THE FUEL COST INBUILT IN THE EXISTING POWER TARIFF FOR ITS POWER STATIONS FOR THE YEAR 2007- 08 IN ACCORDANCE WITH THE REGULATION NO: 2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS.2007
|
326 |
DPL |
FPPCA – 22 / 07 – 08 |
Monday, February 25, 2008 |
2007-2008 |
APPLICATION OF THE DURGAPUR PROJECTS LTD FOR INTERIM INCREASE IN THE FUEL AND POWER PURCHASE COST INBUILT IN THE EXISTING POWER TARIFF FOR THE YEAR 2007- 08 IN ACCORDANCE WITH THE REGULATION NO: 2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATROY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED ON 31.12.2007
|
327 |
CESC Ltd |
FPPCA – 21 / 07 – 08 |
Thursday, January 31, 2008 |
2007-2008 |
APPLICATION OF CESC LTD FOR INTERIM INCREASE IN THE FUEL COST INBUILT IN THE EXISTING POWER TARIFF FOR THE YEAR 2007- 08 IN ACCORDANCE WITH THE REGULATION NO:2.8.7.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION(TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007,AS AMENDED ON 31.12.2007
|
328 |
IPCL |
FPPCA – 9 / 06 – 07,FPPCA –10 / 06 – 07 & FPPCA – 19 / 07 – 08 |
Thursday, January 31, 2008 |
2006-2007 |
APPLICATIONS OF DPSC LTD FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEARS 2004-05,2005-06 AND 2006-07 IN TERMS OF THE TARIFF ORDERS DATED 03.06.2004 IN CASE NO TP-15 / 03-04 DATED 29.03.2005 IN CASE NO TP-21 / 05-06 & DATED 08.05.2006 IN CASE NO TP-24 / 06-07
|
329 |
CESC Ltd |
FPPCA – 15 / 07 – 08 |
Thursday, November 29, 2007 |
2006-2007 |
APPLICATION OF CESC LTD FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2006-07, AND FOR OTHER ADJUSTSMENTS IN TERMS OF THE TARIFF ORDER DATED 08.05.2006 IN CASE NO TP-27 / 06-07
|
330 |
WBSEDCL |
FPPCA – 16 / 07 – 08,FPPCA – 17 / 07 – 08,FPPCA – 1 8 / 07 – 08 |
Monday, October 15, 2007 |
2005-2006 |
APPLICATION OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR YEARS 2003-04, 2004-05 & 2005-06 IN TERMS OF THE TARIFF ORDER DATED 09TH JUNE, 2004 FOR 2003-04 & 2004-05 AND TARIFF ORDER DATED 30TH MARCH 2005 FOR THE YEAR 2005-06
|
331 |
IPCL |
TP -32/ 07 -08 |
Friday, August 31, 2007 |
2007-2008 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2007-08 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE - 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION(OPEN ACCESS) REGULATIONS, 2007.
|
332 |
DPL |
TP -29/07 -08 |
Friday, August 31, 2007 |
2007-2008 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2007-08 UNDER SECTION 62(1)(C)OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION(OPEN ACCESS)REGULATIONS, 2007
|
333 |
WBSEDCL |
TP - 35/ 07 - 08 |
Friday, August 24, 2007 |
2007-2008 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO WBSEDCL FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2007-08 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE- 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007
|
334 |
CESC Ltd |
TP -30/ 07 -08 |
Friday, August 24, 2007 |
2007-2008 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LTD FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2007-08 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE- 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION(OPEN ACCESS) REGULATIONS, 2007.
|
335 |
WBSEDCL |
TP – 35 / 07 - 08 |
Wednesday, August 1, 2007 |
2007-2008 |
THE TARIFF PETITION OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003 FOR THE YEAR 2007 – 2008
|
336 |
WBSETCL |
TP – 34 / 07 - 08 |
Thursday, July 26, 2007 |
2007-2008 |
THE TARIFF PETITION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003 FOR THE YEAR 2007 – 2008
|
337 |
CESC Ltd |
TP – 30 / 0 7 - 08 |
Thursday, July 26, 2007 |
2007-2008 |
THE TARIFF PETITION OF CESC LIMITED FOR THE YEAR 2007 – 2008 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
338 |
IPCL |
TP – 32 / 0 7 - 08 |
Thursday, July 26, 2007 |
2007-2008 |
THE TARIFF PETITION OF DPSC LIMITED FOR THE YEAR 2007 – 2008 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
339 |
DPL |
TP – 29 / 07 - 08 |
Thursday, July 26, 2007 |
2007-2008 |
THE TARIFF PETITION OF DURGAPUR PROJECTS LIMITED FOR THE YEAR 2007 – 2008 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
340 |
WBPDCL |
TP – 31 / 07 – 08 |
Thursday, July 26, 2007 |
2007-2008 |
THE TARIFF PETITION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEAR 2007 – 2008 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
341 |
WBPDCL |
FPPCA-13/06-07 and FPPCA-14/06-07 |
Friday, July 20, 2007 |
2005-2006 |
APPLICATIONS OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD FOR FUEL COST ADJUSTMENT (FCA) FOR THE FINANCIAL YEARS 2004-05 AND 2005-06 IN TERMS OF THE TARIFF ORDERS DATED 03.06.2004 AND DATED 29.03.2005 IN CASES NO: TP-16/03-04 AND TP-19/05-06 RESPECTIVELY
|
342 |
WBSEB |
TP-28/06-07 |
Tuesday, February 13, 2007 |
2006-2007 |
FOR DETERMINATION OF TRANSMISSION AND WHEELING CHARGES PAYABLE TO WBSEB FOR THE USE OF ITS TRANSMISSION AND DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2006-07 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH REGUATION NO. 4.2 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS FOR OPEN ACCESS – SCHEDULE OF CHARGES, FEES & FORMATS FOR OPEN ACCESS) REGULATIONS, 2005.
|
343 |
WBSEB |
CASE NO: TP-28/06-07 |
Tuesday, February 13, 2007 |
2004-2005 |
Tariff Order of WBSEB
|
344 |
CESC Ltd |
TP-27/06-07 |
Monday, February 12, 2007 |
2006-2007 |
FOR DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2006-07 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH REGUATION NO. 4.2 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS FOR OPEN ACCESS – SCHEDULE OF CHARGES, FEES & FORMATS FOR OPEN ACCESS) REGULATIONS, 2005
|
345 |
IPCL |
TP – 24 / 06-07 |
Monday, May 8, 2006 |
2006-2007 |
Corrigendum to the Tariff Order dated 08.05.2006 of the Commission in respect of DPSC Limited in TP – 24 / 06-07
|
346 |
CESC Ltd |
TP – 27 / 06-07 |
Monday, May 8, 2006 |
2006-2007 |
Corrigendum to the Tariff Order dated 08.05.2006 of the Commission in respect of CESC Limited in TP – 27 / 06-07
|
347 |
DPL |
TP – 25 / 06-07 |
Monday, May 8, 2006 |
2006-2007 |
Corrigendum to the Tariff Order dated 08.05.2006 of the Commission in respect of Durgapur Projects Limited in TP – 25 / 06-07
|
348 |
WBSEB |
Petition for WBSEB |
Monday, May 8, 2006 |
2006-2007 |
Tariff Order of WBSEB dated 08.05.2006
|
349 |
WBPDCL |
Petition for WBPDCL |
Monday, May 8, 2006 |
2006-2007 |
Tariff Order for WBPDCL dated 08.05.2006
|
350 |
CESC Ltd |
Petition for CESC |
Monday, April 4, 2005 |
2004-2005 |
JOINT ORDER FOR PET 02-03/03-04/04-05
|