Sl. No Utilities Case No. Date Matter
1. West Bengal Power Development Corporation Ltd.( WBPDCL ) TP – 73 / 16 – 17 Friday, July 7, 2017

IN RE THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR DETERMINATION OF TARIFF FOR EXTENSION UNITS NO III AND IV OF
ITS THERMAL POWER STATION AT SAGARDIGHI FOR THE YEAR 2016 – 2017 UNDER FOURTH CONTROL PERIOD UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY
ACT, 2003

2. Damodar Valley Corporation (DVC) TP – 57 / 13 -14 Friday, March 3, 2017

THE TARIFF APPLICATION OF DAMODAR VALLEY CORPORATION FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003

3. IPCL. Indian Power Corporation Ltd.(IPCL) [Formerly Known as DPSC Ltd] CASE NO: TP(R) -26/16- 17 Friday, February 17, 2017

REVIEW OF THE TARIFF ORDER DATED 21ST JULY, 2016 PASSED BY THE COMMISSION IN CASE NO. TP-58/13-14 IN RESPECT OF INDIA POWER CORPORATION LIMITED FOR THE YEARS 2014 – 2015, 2015 – 2016 AND 2016-2017 EMERGED UPON SCRUTINY OF THE SAID TARIFF ORDER

4. Durgapur Projects Ltd.(DPL) FPPCA – 72 / 14 – 15 AND APR – 43 / 14 - 15 Thursday, February 16, 2017

APPLICATIONS OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013-2014

5. Durgapur Projects Ltd.(DPL) FPPCA – 72 / 14 – 15 AND APR – 43 / 14 - 15 Thursday, February 16, 2017

APPLICATIONS OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013-2014

6. Durgapur Projects Ltd.(DPL) FPPCA – 72 / 14 – 15 AND APR – 43 / 14 - 15 Thursday, February 16, 2017

APPLICATIONS OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013-2014

7. Durgapur Projects Ltd.(DPL) FPPCA – 72 / 14 – 15 AND APR – 43 / 14 - 15 Thursday, February 16, 2017

APPLICATIONS OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013-2014

8. West Bengal Power Development Corporation Ltd.( WBPDCL ) TP – 59 / 13 – 14 Friday, October 28, 2016

THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

9. West Bengal State Electricity Distribution Company Ltd. (WBSEDCL) TP – 61 / 13 – 14 Friday, October 28, 2016

IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

10. Durgapur Projects Ltd.(DPL) TP – 55/13- 14 Friday, October 28, 2016

THE TARIFF APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003

11. West Bengal State Electricity Transmission Company Ltd.(WBSETCL) TP – 60 / 13 - 14 Friday, October 28, 2016

THE TARIFF APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

12. CESC Ltd TP – 56 / 13 - 14 Friday, October 28, 2016

THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

13. IPCL. Indian Power Corporation Ltd.(IPCL) [Formerly Known as DPSC Ltd] FPPCA – 64 / 13 – 14 Monday, September 12, 2016

APPLICATION OF INDIAN POWER CORPORATION LIMITED IN THE MATTER OF FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA)OF DPSC LIMITED (DPSCL)FOR THE FINANCIAL YEAR 2012–2013

14. IPCL. Indian Power Corporation Ltd.(IPCL) [Formerly Known as DPSC Ltd] TP – 58 / 13 – 14 Thursday, July 21, 2016

THE TARIFF APPLICATION OF INDIA POWER CORPORATION LIMITED FOR THE YEARS 2014-15,2015-16 AND 2016-17 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003

15. Haldia Energy Limited TP – 64 / 14 - 15 Friday, January 29, 2016

Tariff Order FOR 2 X 300 MW GENERATING STATION AT HALDIA FOR THE YEARS 2014 – 2015, 2015 – 2016 AND 2016 – 2017 dated 29.01.2016

16. Haldia Energy Limited TP – 63 / 14 - 15 Friday, January 29, 2016

Tariff Order FOR 400 KV DOUBLE CIRCUIT DEDICATED LINE FOR EVACUATION OF POWER UPTO 400 KV SUBHASGRAM SUBSTATION OF POWER GRID CORPORATION FOR THE YEARS 2014 – 2015, 2015 – 2016 AND 2016 – 2017 dated 29.01.2016

17. Durgapur Projects Ltd.(DPL) TP – 55/13- 14 Thursday, October 29, 2015

THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2015–2016 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003

18. Damodar Valley Corporation (DVC) TP – 62 / 14 - 15 Monday, August 24, 2015

THE TARIFF APPLICATION OF DAMODAR VALLEY CORPORATION FOR THE YEARS 2009– 2010, 2010 –2011,2011– 2012, 2012– 2013 AND 2013– 2014 UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

19. CESC Ltd TP – 56 / 13 - 14 Monday, August 10, 2015

THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

20. CESC Ltd TP – 56 / 13 - 14 Monday, August 10, 2015

THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

21. West Bengal State Electricity Distribution Company Ltd. (WBSEDCL) TP – 61 / 13 – 14 Monday, August 10, 2015

IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 AN 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

22. West Bengal State Electricity Distribution Company Ltd. (WBSEDCL) TP – 61 / 13 – 14 Monday, August 10, 2015

IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

23. West Bengal State Electricity Transmission Company Ltd.(WBSETCL) TP – 60 / 13 - 14 Monday, June 22, 2015

THE TARIFF APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2014-2015,2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

24. West Bengal Power Development Corporation Ltd.( WBPDCL ) TP – 59 / 13 – 14 Friday, June 19, 2015

THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

25. Damodar Valley Corporation (DVC) TP – 57 / 13 -14 Monday, May 25, 2015

THE TARIFF APPLICATION OF DAMODAR VALLEY CORPORATION FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003

26. Durgapur Projects Ltd.(DPL) TP – 55/13- 14 Friday, March 20, 2015

THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2014–2015 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003

27. CESC Ltd TP –56 / 13-14 Friday, March 20, 2015

THE DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2014– 2015 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003

28. CESC Ltd TP – 56 / 13 - 14 Wednesday, March 4, 2015

THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

29. West Bengal State Electricity Transmission Company Ltd.(WBSETCL) TP – 60 / 13 - 14 Wednesday, March 4, 2015

THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2014– 2015,2015– 2016 AND 2016– 2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003

30. West Bengal State Electricity Distribution Company Ltd. (WBSEDCL) TP – 61 / 13 - 14 Wednesday, March 4, 2015

THE TARIFF APPLICATION OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003

31. West Bengal Power Development Corporation Ltd.( WBPDCL ) TP – 59 / 13 – 14 Wednesday, March 4, 2015

THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003

32. Durgapur Projects Ltd.(DPL) TP - 55/13 - 14 Wednesday, March 4, 2015

Corrigendum to the Tariff Order dated 04.03.2015 of the Commission including the corrigendum dated 19.03.2015 in regard to the Tariff Application of the Durgapur Projects Limited (DPL) for the years 2014-2015 to 2016-2017 in Case No TP-55/13-14

33. West Bengal Power Development Corporation Ltd.( WBPDCL ) WBERC/FPPCA-61/12-13 AND WBERC/FPPCA-67/13-14 Thursday, December 11, 2014

THE SUBMISSION MADE BY THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED (WBPDCL) FOR RECOVERY OF ARREAR FUEL COST ADJUSTMENT CLAIMS (FCA) ON ACCOUNT OF FCA ORDERS FOR THE YEAR 2011-12 AND 2012-13.

34. West Bengal Power Development Corporation Ltd.( WBPDCL ) APR – 39 / 13 – 14 Monday, July 21, 2014

THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR ANNUAL PERFORMANCE REVIEW OF THE FINANCIAL YEAR 2012–2013

35. West Bengal State Electricity Distribution Company Ltd. (WBSEDCL) APR – 38 / 13 – 14 Thursday, June 12, 2014

THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012–2013.

36. West Bengal State Electricity Transmission Company Ltd.(WBSETCL) APR – 37 / 13 – 14 Tuesday, June 10, 2014

THE APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012–2013

37. West Bengal Power Development Corporation Ltd.( WBPDCL ) FPPCA-67/13 – 14 Friday, June 6, 2014

THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR FUEL COST ADJUSTMENT (FCA) FOR THE FINANCIAL YEAR 2012 – 2013

38. Durgapur Projects Ltd.(DPL) APR – 40 / 13 – 14 Wednesday, May 21, 2014

THE APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012– 2013

39. CESC Ltd APR – 36 / 13 – 14 Wednesday, May 21, 2014

THE APPLICATION OF CESC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012-13

40. Durgapur Projects Ltd.(DPL) APR – 40 / 13 – 14 Wednesday, May 21, 2014

THE APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012– 2013

41. Durgapur Projects Ltd.(DPL) FPPCA – 68 / 13 – 1 Wednesday, April 30, 2014

APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2012-2013

42. Durgapur Projects Ltd.(DPL) FPPCA – 68 / 13 – 14 Wednesday, April 30, 2014

APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2012-2013.

43. IPCL. Indian Power Corporation Ltd.(IPCL) [Formerly Known as DPSC Ltd] TP – 51/ 11 – 12 Tuesday, April 1, 2014

THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2012-2013 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003

44. IPCL. Indian Power Corporation Ltd.(IPCL) [Formerly Known as DPSC Ltd] TP – 51/ 11 – 12 Tuesday, April 1, 2014

THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2013-2014 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003

45. IPCL. Indian Power Corporation Ltd.(IPCL) [Formerly Known as DPSC Ltd] TP – 51/ 11 – 12 Tuesday, April 1, 2014

THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2011-2012 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003

46. Durgapur Projects Ltd.(DPL) TP – 49/11- 12 Friday, March 28, 2014

THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2011–2012 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003

47. Durgapur Projects Ltd.(DPL) TP – 49/11- 12 Friday, March 28, 2014

THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2012–2013 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003

48. Durgapur Projects Ltd.(DPL) TP – 49/11- 12 Friday, March 28, 2014

THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2013-2014 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003

49. CESC Ltd TP –48 / 11-12 Tuesday, March 4, 2014

THE DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2013– 2014 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003

50. West Bengal State Electricity Distribution Company Ltd. (WBSEDCL) FPPCA – 66 / 13 – 14 Tuesday, March 4, 2014

APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2012-2013