151 |
CESC Ltd |
FPPCA-71/14-15 AND APR-44/14-15 |
Friday, November 27, 2020 |
2013-2014 |
CORRIGENDUM TO THE ORDER DATED 02.03.2020 OF THE COMMISSION IN REGARD TO THE FPPCA AND APR APPLICATIONS OF THE CESC LIMITED, FOR THE FINANCIAL YEAR 2013-2014 IN CASES NO FPPCA-71/14-15 AND APR-44/14-15
|
152 |
DPL |
TP-87/19-20 (PART-II) |
Friday, November 13, 2020 |
2018-2019, 2019-2020 |
IN REGARD TO THE MULTI YEAR TARIFF APPLICATION UNDER SIXTH CONTROL PERIOD (PART-II) OF THE DURGAPUR PROJECTS LIMITED FOR THE YEAR 2018-19 ( FROM 01.01.2019 TO 31.03.2019) AND 2019-20 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
153 |
DPL |
TP-87/19-20 |
Sunday, October 11, 2020 |
2018-2019 |
IN REGARD TO THE MULTI YEAR TARIFF APPLICATION UNDER SIXTH CONTROL PERIOD OF THE DURGAPUR PROJECTS LIMITED FOR THE YEAR 2018-19 [ UPTO THE PERIOD 31.12.2018 (PART - I)] UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
154 |
DVC |
TP(R)-30/20-21 |
Tuesday, October 6, 2020 |
2006-2007, 2007-2008, 2008-2009 |
IN RE THE PETITION SUBMITTED BY DAMODAR VALLEY CORPORATION FOR REVIEW OF TARIFF ORDER DATED 19.06.2020 FOR THE YEARS 2006-2007 , 2007-2008 AND 2008-2009
|
155 |
DPL |
TP-66/16-17 |
Monday, August 3, 2020 |
2017-2018 |
IN REGARD TO THE MULTI YEAR TARIFF APPLICATION UNDER FIFTH CONTROL PERIOD OF THE DURGAPUR PROJECTS LIMITED FOR THE YEAR 2017-18 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
156 |
WBSETCL |
APR- 42 / 14-15 |
Monday, July 20, 2020 |
2013-2014 |
IN RE THE APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2013 - 2014
|
157 |
DVC |
TP-80/19-20/1 |
Wednesday, July 1, 2020 |
2006-2007, 2007-2008, 2008-2009 |
IN REGARD TO THE COMPLIANCE OF THE DIRECTIVES IN TERMS OF THE TARIFF ORDER OF DAMODAR VALLEY CORPORATION (DVC) DATED 19.06.2020 IN RESPECT OF THE DISTRIBUTION ACTIVITY OF DVC IN THE STATE OF WEST BENGAL FOR THE PERIOD FY 2006-2007 TO 2008-2009
|
158 |
DVC |
TP-80/19-20 |
Friday, June 19, 2020 |
2006-2007, 2007-2008, 2008-2009 |
IN REGARD TO THE APPLICATION OF THE DAMODAR VALLEY CORPORATION IN TERMS OF ORDER PASSED BY THE HON'BLE HIGH COURT AT CALCUTTA ON 05.03.2019 FOR DETERMINATION OF
RETAIL TARIFF FOR THE CONSUMERS IN THE AREA OF THE STATE OF WEST BENGAL FOR THE YEARS 2006-07 - 2008-09 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF
THE ELECTRICITY ACT, 2003
|
159 |
CESC Ltd |
TP-72/16-17-COMPLIANCE |
Monday, June 15, 2020 |
2017-2018 |
IN REGARD TO THE PETITION SUBMITTED BY CESC LIMITED SEEKING EXTENSION OF TIME FOR COMPLIANCE WITH THE DIRECTION PASSED VIDE ORDER DATED 02.03.2020 IN CASE NO TP-72/16-17-COMPLIANCE
|
160 |
DVC |
TP-83/19-20 |
Thursday, March 19, 2020 |
2009-2010, 2010-2011, 2011-2012, 2012-2013 |
IN REGARD TO THE APPLICATION OF THE DAMODAR VALLEY
CORPORATION IN TERMS OF ORDER PASSED BY THE HON'BLE
HIGH COURT AT CALCUTTA ON 12.06.2019 FOR DETERMINATION
OF RETAIL TARIFF FOR THE CONSUMERS IN THE AREA OF THE
STATE OF WEST BENGAL FOR THE YEARS 2009-10 - 2012-13
UNDER SECTION 64(3)(a) READ WITH SECTION 61(1) AND SECTION
62(3) OF THE ELECTRICITY ACT, 2003
|
161 |
CESC Ltd |
TP-72/16-17-COMPLIANCE |
Monday, March 2, 2020 |
2017-2018 |
ORDER OF THE COMMISSION IN REGARD TO DIRECTIONS GIVEN IN THE TARIFF ORDER FOR THE YEAR 2017-1018
|
162 |
CESC Ltd |
FPPCA-71/14-15 AND APR-44/14-15 |
Monday, March 2, 2020 |
2013-2014 |
IN RE APPLICATIONS OF CESC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013-14
|
163 |
IPCL |
APR- 41/13 -14 |
Monday, December 2, 2019 |
2012-2013 |
IN REGARD TO THE APPLICATION OF THE DPSC LIMITED (NOW IPCL) FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2012 - 2013
|
164 |
WBPDCL |
TP(R)-27/18-19 |
Monday, December 2, 2019 |
2017-2018 |
IN REGARD TO PETITION SUBMITTED BY THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR REVIEW OF TARIFF ORDER DATED 13.09.2018 FOR THE YEAR 2017 - 2018 IN CASE NO.TP-69/16-17
|
165 |
WBPDCL |
APR(R)-3/13-14 |
Friday, November 1, 2019 |
2011-2012 |
IN REGARD TO PETITION SUBMITTED BY THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR REVIEW OF ANNUAL PERFORMANCE REVIEW ORDER DATED 05.09.2013 FOR THE YEAR 2011- 2012 IN CASE NO. APR-31/12-13
|
166 |
WBPDCL |
TP-69 /16-17 |
Thursday, September 13, 2018 |
2017-2018 |
IN RE THE MULTI YEAR TARIFF APPLICATION UNDER FIFTH CONTROL PERIOD OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEAR 2017 – 2018
|
167 |
WBPDCL |
APR(R)-6/14-15 |
Wednesday, August 29, 2018 |
2012-2013 |
IN RE PETITION SUBMITTED BY THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR REVIEW OF ANNUAL PERFORMANCE REVIEW ORDER DATED 21.07.2014 FOR THE YEAR 2012-13 IN CASE NO. APR- 39 / 13 - 14
|
168 |
DPL |
CASE NO: FPPCA(R)-4/17-18 |
Wednesday, August 29, 2018 |
2013-2014 |
IN RE PETITION SUBMITTED BY THE DURGAPUR PROJECT LIMITED FOR REVIEW OF ANNUAL PERFORMANCE REVIEW ORDER DATED 16.02.2017 FOR THE YEAR 2013-14 IN CASE NO. FPPCA- 72 / 14-15 AND APR - 43 / 14 - 15
|
169 |
DVC |
TP(R)-25/15-16 |
Thursday, July 12, 2018 |
2014-2015, 2015-2016, 2016-2017 |
IN RE PETITION SUBMITTED BY DAMODAR VALLEY CORPORATION FOR REVIEW OF TARIFF ORDER DATED 25.05.2015 FOR THE YEARS 2014- 2015 TO 2016 - 2017 IN CASE NO. TP - 57 / 13 -14
|
170 |
CESC Ltd |
TP – 72 / 16 - 17 |
Wednesday, July 4, 2018 |
2017-2018 |
IN RE THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEAR 2017 – 2018 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
171 |
WBSETCL |
TP – 70 / 16 - 17 |
Wednesday, July 4, 2018 |
2017-2018 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEAR 2017 – 2018 UNDER SECTION 64(3)(a) READ WITH SECTION 62 (1) OF THE ELECTRICITY ACT, 2003
|
172 |
WBSEDCL |
TP – 65 / 16 - 17 |
Wednesday, July 4, 2018 |
2017-2018 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEAR 2017 – 2018 COVERING FIFTH CONTROL PERIOD UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
173 |
HEL |
TP – 68 / 16 – 17 |
Monday, November 27, 2017 |
2017-2018 |
IN RE THE MULTI YEAR TARIFF APPLICATION OF HALDIA ENERGY LIMITED UNDER FIFTH CONTROL PERIOD FOR THE YEAR 2017 – 2018 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
174 |
WBPDCL |
FPPCA – 73 / 14 – 15 AND APR – 45 / 14 - 15 |
Thursday, August 24, 2017 |
2013-2014 |
IN RE APPLICATIONS OF WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR FUEL COST ADJUSTMENT (FCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013- 2014
|
175 |
WBPDCL |
TP – 73 / 16 – 17 |
Friday, July 7, 2017 |
2016-2017 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR DETERMINATION OF TARIFF FOR EXTENSION UNITS NO III AND IV OF ITS THERMAL POWER STATION AT SAGARDIGHI FOR THE YEAR 2016 – 2017 UNDER FOURTH CONTROL PERIOD UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
176 |
DVC |
TP – 57 / 13 -14 |
Friday, March 3, 2017 |
2016-2017 |
THE TARIFF APPLICATION OF DAMODAR VALLEY CORPORATION FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
177 |
IPCL |
TP(R) -26/16- 17 |
Friday, February 17, 2017 |
2016-2017 |
REVIEW OF THE TARIFF ORDER DATED 21ST JULY, 2016 PASSED BY THE COMMISSION IN CASE NO. TP-58/13-14 IN RESPECT OF INDIA POWER CORPORATION LIMITED FOR THE YEARS 2014 – 2015, 2015 – 2016 AND 2016-2017 EMERGED UPON SCRUTINY OF THE SAID TARIFF ORDER
|
178 |
DPL |
FPPCA – 72 / 14 – 15 AND APR – 43 / 14 - 15 |
Thursday, February 16, 2017 |
2013-2014 |
APPLICATIONS OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2013-2014
|
179 |
WBSEDCL |
TP – 61 / 13 – 14 |
Friday, October 28, 2016 |
2016-2017 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
180 |
WBSETCL |
TP – 60 / 13 - 14 |
Friday, October 28, 2016 |
2016-2017 |
THE TARIFF APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
181 |
CESC Ltd |
TP – 56 / 13 - 14 |
Friday, October 28, 2016 |
2016-2017 |
THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
182 |
DPL |
TP – 55/13- 14 |
Friday, October 28, 2016 |
2016-2017 |
THE TARIFF APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
183 |
WBPDCL |
TP – 59 / 13 – 14 |
Friday, October 28, 2016 |
2016-2017 |
THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
184 |
IPCL |
FPPCA – 64 / 13 – 14 |
Monday, September 12, 2016 |
2012-2013 |
APPLICATION OF INDIAN POWER CORPORATION LIMITED IN THE MATTER OF FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA)OF DPSC LIMITED (DPSCL)FOR THE FINANCIAL YEAR 2012–2013
|
185 |
IPCL |
TP – 58 / 13 – 14 |
Thursday, July 21, 2016 |
2014-2015, 2015-2016, 2016-2017 |
THE TARIFF APPLICATION OF INDIA POWER CORPORATION LIMITED FOR THE YEARS 2014-15,2015-16 AND 2016-17 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT,2003
|
186 |
HEL |
TP – 64 / 14 - 15 |
Friday, January 29, 2016 |
2014-2015, 2015-2016, 2016-2017 |
Tariff Order FOR 2 X 300 MW GENERATING STATION AT HALDIA FOR THE YEARS 2014 – 2015, 2015 – 2016 AND 2016 – 2017 dated 29.01.2016
|
187 |
HEL |
TP – 63 / 14 - 15 |
Friday, January 29, 2016 |
2014-2015, 2015-2016, 2016-2017 |
Tariff Order FOR 400 KV DOUBLE CIRCUIT DEDICATED LINE FOR EVACUATION OF POWER UPTO 400 KV SUBHASGRAM SUBSTATION OF POWER GRID CORPORATION FOR THE YEARS 2014 – 2015, 2015 – 2016 AND 2016 – 2017 dated 29.01.2016
|
188 |
WBSEDCL |
TP - 61 / 13-14 |
Friday, October 30, 2015 |
2013-2014 |
IN RE THE DETERMINATION OF WHEELING CHARGES PAYABLE TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2015 - 2016 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003 .
|
189 |
CESC Ltd |
TP –56 / 13-14 |
Thursday, October 29, 2015 |
2015-2016 |
IN RE THE DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2015 – 2016 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003.
|
190 |
DPL |
TP – 55/13- 14 |
Thursday, October 29, 2015 |
2015-2016 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2015–2016 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003
|
191 |
DVC |
TP – 62 / 14 - 15 |
Monday, August 24, 2015 |
2009-2010 |
THE TARIFF APPLICATION OF DAMODAR VALLEY CORPORATION FOR THE YEARS 2009– 2010, 2010 –2011,2011– 2012, 2012– 2013 AND 2013– 2014 UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
192 |
WBSEDCL |
TP – 61 / 13 – 14 |
Monday, August 10, 2015 |
2015-2016 |
IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
193 |
CESC Ltd |
TP – 56 / 13 - 14 |
Monday, August 10, 2015 |
2015-2016 |
THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
194 |
DPL |
TP – 55 / 13 - 14 |
Tuesday, June 23, 2015 |
2015-2016 |
IN RE THE TARIFF APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
195 |
WBSETCL |
TP – 60 / 13 - 14 |
Monday, June 22, 2015 |
2015-2016 |
THE TARIFF APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2014-2015,2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
196 |
WBPDCL |
TP – 59 / 13 – 14 |
Friday, June 19, 2015 |
2015-2016 |
THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2014-2015, 2015-2016 AND 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
197 |
DVC |
TP – 57 / 13 -14 |
Monday, May 25, 2015 |
2014-2015 |
THE TARIFF APPLICATION OF DAMODAR VALLEY CORPORATION FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a)READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
198 |
CESC Ltd |
TP –56 / 13-14 |
Friday, March 20, 2015 |
2014-2015 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2014– 2015 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003
|
199 |
DPL |
TP – 55/13- 14 |
Friday, March 20, 2015 |
2014-2015 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2014–2015 UNDER SECTION 62(1)(c) OF THE ELECTRICITY ACT, 2003
|
200 |
WBSEDCL |
TP – 61 / 13 - 14 |
Wednesday, March 4, 2015 |
2014-2015 |
THE TARIFF APPLICATION OF WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2014-2015, 2015-2016 and 2016-2017 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|