251 |
WBSETCL |
TP – 50 / 11 - 12 |
Saturday, December 1, 2012 |
2012-2013 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2011–2012, 2012–2013 AND 2013–2014 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
252 |
WBSETCL |
TP – 50 / 11 - 12 |
Saturday, December 1, 2012 |
2011-2012 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2011– 2012, 2012 –2013 AND 2013– 2014 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
253 |
CESC Ltd |
TP – 48 /11 - 12 |
Saturday, December 1, 2012 |
2012-2013 |
THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2011-2012, 2012-2013 and 2013-2014 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
254 |
WBPDCL |
TP – 54 / 12 – 13 |
Saturday, December 1, 2012 |
2011-2012 |
THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2011-201, 2012-2013 AND 2013-2014 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
255 |
WBPDCL |
APR – 27 / 11 – 12 |
Wednesday, November 21, 2012 |
2010-2011 |
THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR ANNUAL PERFORMANCE REVIEW
OF THE FINANCIAL YEAR 2010 – 2011
|
256 |
WBPDCL |
APR – 23 / 10 – 11 |
Wednesday, November 21, 2012 |
2009-2010 |
THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2009– 2010
|
257 |
WBSEDCL |
APR – 29 / 12 – 13 |
Friday, October 19, 2012 |
2010-2011 |
THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2010 – 2011.
|
258 |
WBSETCL |
APR – 26 / 11 – 12 |
Friday, October 19, 2012 |
2010-2011 |
THE APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2010–2011
|
259 |
CESC Ltd |
FPPCA – 54 /11- 12 |
Friday, October 19, 2012 |
2010-2011 |
APPLICATION OF THE CESC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2010 - 2011
|
260 |
WBSEDCL |
APR – 20 / 10 – 11 |
Wednesday, October 17, 2012 |
2009-2010 |
THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2009 – 2010.
|
261 |
WBPDCL |
FPPCA-55/11 – 12 |
Tuesday, October 16, 2012 |
2010-2011 |
THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR FUEL COST ADJUSTMENT (FCA) FOR THE FINANCIAL YEAR 2010 – 2011
|
262 |
WBSEDCL |
FPPCA – 57 / 11 – 12 |
Wednesday, October 3, 2012 |
2010-2011 |
APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2010-2011
|
263 |
WBSETCL |
APR – 21 / 10 – 11 |
Thursday, August 30, 2012 |
2009-2010 |
THE APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2009 – 2010 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS,2011, AS AMENDED
|
264 |
WBPDCL |
FPPCA -48/10 – 11 |
Thursday, August 30, 2012 |
2009-2010 |
THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR FUEL COST ADJUSTMENT (FCA) FOR THE FINANCIAL YEAR 2009 – 2010 IN ACCORDANCE WITH
THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011
|
265 |
IPCL |
APR – 19 / 10 – 11 |
Friday, August 24, 2012 |
2009-2010 |
THE APPLICATION OF THE DPSC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2009–2010 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS,2011.
|
266 |
DPL |
APR - 28 / 11 – 12 |
Friday, August 24, 2012 |
2010-2011 |
Corrigendum to the Order dated 24.08.2012 of the Commission forAPR 2010-2011 in respect of THE DURGAPUR PROJECTS LIMITED in CASE No. APR- 28/ 11– 12
|
267 |
DPL |
APR – 18 / 10 – 11 |
Friday, August 24, 2012 |
2009-2010 |
THE APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2009– 2010 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS,2011
|
268 |
DPL |
FPPCA – 56 / 11 – 12 |
Thursday, August 2, 2012 |
2010-2011 |
APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2010–2011 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011
|
269 |
DPL |
FPPCA – 46 / 10 – 11 |
Thursday, August 2, 2012 |
2009-2010 |
APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2009 – 2010 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011
|
270 |
IPCL |
FPPCA – 44 / 10 – 11 |
Monday, June 4, 2012 |
2009-2010 |
APPLICATION OF DPSC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA) FOR THE FINANCIAL YEAR 2009 – 2010 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011.
|
271 |
CESC Ltd |
TP – 48 / 11 – 12 |
Monday, April 30, 2012 |
2011-2012 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2011– 2012 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011 AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007, AS AMENDED.
|
272 |
CESC Ltd |
TP – 48 / 11 - 12 |
Tuesday, March 6, 2012 |
2011-2012 |
THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2011-2012, 2012-2013 and 2013-2014 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
273 |
CESC Ltd |
APR – 22 /10 – 11 |
Thursday, February 23, 2012 |
2009-2010 |
THE APPLICATION OF CESC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2009-10 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION(TERMS AND CONDITIONS OF TARIFF)REGULATIONS,2011
|
274 |
CESC Ltd |
FPPCA – 45/ 10-11 |
Wednesday, February 22, 2012 |
2009-2010 |
APPLICATION OF THE CESC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2009-2010 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011
|
275 |
WBPDCL |
TP – 42 / 09 – 10 and TP – 45 / 09 – 10 and TP – 46 / 09 – 10 |
Friday, December 30, 2011 |
2009-2010 |
THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR DETERMINATION OF TARIFF FOR ITS GREENFIELD THERMAL POWER STATION AT SAGARDIGHI AND EXTENSION UNITS AT BAKRESWAR AND SANTALDIH THERMAL POWER STATIONS FOR THE SECOND CONTROL PERIOD COVERING FINANCIAL YEARS 2008-2009,2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
276 |
WBSEDCL |
TP – 41 / 08 – 09 |
Friday, December 30, 2011 |
2010-2011 |
THE APPLICATION FILED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR RE-DETERMINATION OF TARIFF FOR THE YEAR 2010-11 PURSUANT TO THE DIRECTION OF THE HON’BLE APPELLATE TRIBUNAL FOR ELECTRICITY GIVEN IN THE ORDER DATED 04.04.2011 IN IA NO.62 OF 2011 IN APPEAL NO.173 OF 2010
|
277 |
IPCL |
TP – 40/ 08 – 09 |
Friday, October 1, 2010 |
2009-2010 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2010 - 2011 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007, AS MENDED.
|
278 |
WBSEDCL |
TP – 41/ 08 – 09 |
Friday, October 1, 2010 |
2010-2011 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2010 – 2011 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS MENDED AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007, AS AMENDED.
|
279 |
CESC Ltd |
TP – 37/ 08 – 09 |
Friday, October 1, 2010 |
2010-2011 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO CESC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2010 – 2011 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007, AS AMENDED.
|
280 |
IPCL |
TP – 40/ 08 – 09 |
Friday, October 1, 2010 |
2010-2011 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DPSC LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2010 - 2011 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007, AS MENDED.
|
281 |
DPL |
TP – 38/ 08 – 09 |
Friday, October 1, 2010 |
2010-2011 |
THE DETERMINATION OF WHEELING CHARGES PAYABLE TO DURGAPUR PROJECTS LIMITED FOR THE USE OF ITS DISTRIBUTION SYSTEM FOR CONVEYANCE OF ELECTRICITY BY OPEN ACCESS CUSTOMERS INCLUDING CAPTIVE GENERATING PLANTS DURING THE FINANCIAL YEAR 2010 – 2011 UNDER SECTION 62(1)(C) OF THE ELECTRICITY ACT, 2003 READ WITH SCHEDULE – 4 TO THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED AND THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (OPEN ACCESS) REGULATIONS, 2007, AS AMENDED
|
282 |
DPL |
APR - 28 / 11 – 12 |
Tuesday, August 24, 2010 |
2010-2011 |
THE APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2010– 2011 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS,2011
|
283 |
WBSEDCL |
TP – 41 / 08 – 09 |
Thursday, July 29, 2010 |
2010-2011 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
284 |
WBSETCL |
TP – 36 / 08 - 09 |
Thursday, July 29, 2010 |
2010-2011 |
THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
285 |
CESC Ltd |
TP – 37 / 08 - 09 |
Thursday, July 29, 2010 |
2010-2011 |
THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2008-09, 2009-2010 and 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
286 |
IPCL |
TP – 40 / 08 – 09 |
Thursday, July 29, 2010 |
2010-2011 |
THE TARIFF APPLICATION OF DPSC LIMITED FOR THE YEARS 2008 – 09, 2009 – 10 AND 2010 – 11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
287 |
DPL |
TP – 38 / 08 - 09 |
Thursday, July 29, 2010 |
2010-2011 |
THE TARIFF APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR THE YEARS 2008 – 09,2009 – 10 AND 2010 – 11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3)OF THE ELECTRICITY ACT, 2003
|
288 |
WBPDCL |
TP – 39 / 08 – 09 |
Thursday, July 29, 2010 |
2010-2011 |
THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEARS 2008-2009, 2009-10 AND 2010-11 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
289 |
WBSETCL |
PR – 13 / 09 – 10 |
Monday, July 26, 2010 |
2008-2009 |
IN RE THE APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2008 – 2009 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED.
|
290 |
WBSEDCL |
APR – 16 / 09 – 10 |
Monday, July 26, 2010 |
2008-2009 |
THE APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2008 – 2009 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED
|
291 |
CESC Ltd |
APR– 14 / 09 – 10 |
Monday, July 26, 2010 |
2008-2009 |
THE APPLICATION OF CESC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2008-09 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION(TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED.
|
292 |
IPCL |
PR – 12 / 09 – 10 |
Monday, July 26, 2010 |
2008-2009 |
THE APPLICATION OF THE DPSC LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2008 – 2009 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED.
|
293 |
WBPDCL |
APR – 17 / 09 – 10 |
Monday, July 26, 2010 |
2008-2009 |
THE APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR ANNUAL PERFORMANCE REVIEW OF THE FINANCIAL YEAR 2008 – 2009 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED
|
294 |
DPL |
APR – 15 / 09 – 10 |
Monday, July 26, 2010 |
2008-2009 |
THE APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2008 – 2009 IN TERMS OF REGULATION 2.6 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF)REGULATIONS, 2007, AS AMENDED
|
295 |
DPL |
FPPCA – 41 / 09 – 10 |
Wednesday, June 30, 2010 |
2008-2009 |
APPLICATION OF THE DURGAPUR PROJECTS LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2008- 2009 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007,AS AMENDED
|
296 |
WBSEDCL |
FPPCA – 43 / 10 – 11 |
Wednesday, June 30, 2010 |
2009-2010 |
APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2009- 2010 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
297 |
WBSEDCL |
FPPCA – 38 / 09 – 10 |
Wednesday, June 30, 2010 |
2008-2009 |
APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) FOR THE FINANCIAL YEAR 2008- 2009 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007, AS AMENDED
|
298 |
CESC Ltd |
FPPCA – 40 / 09 – 10 |
Wednesday, June 30, 2010 |
2008-2009 |
APPLICATION OF THE CESC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA) FOR THE FINANCIAL YEAR 2008- 2009 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007,AS AMENDED.
|
299 |
IPCL |
FPPCA – 34 / 09 – 10 |
Wednesday, June 30, 2010 |
2008-2009 |
APPLICATION OF DPSC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT(FPPCA) FOR THE FINANCIAL YEAR 2008- 2009 IN ACCORDANCE WITH THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2007,AS AMENDED
|
300 |
IPCL |
FPPCA- 28/08- 09 |
Wednesday, June 9, 2010 |
2007-2008 |
ON REMAND OF APPEAL NO: 138/09 BY THE HON’BLE APPELLATE TRIBUNAL FOR ELECTRICITY FOR THE DE NOVO DETERMINATION OF COST TO BE DISALLOWED, IF ANY, WITH REFERENCE TO PARAGRAPH 2.2.3 IN COMMISSION’S ORDER DATED 27.05.2009 IN THE REFERRED CASE RELATING TO ALLOWABLE FUEL & POWER PURCHASE COST ADJUSTMENTS FOR DPSC LIMITED FOR THE YEAR 2007-2008
|