1 |
IPCL |
APR(R)-35/24-25 |
Tuesday, November 19, 2024 |
2017-2018 |
PETITION UNDER SECTION 94(1)(F) OF THE ELECTRICITY ACT,2003 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 FOR REVIEW OF FPPCA AND APR ORDER OF INDIA POWER CORPORATION LIMITED FOR THE FY 2017-18 ISSUED BY THE COMMISSION ON 07.03.2024 IN CASE NO. FPPCA-105/21-22 AND APR-98/22-23
|
2 |
IPCL |
APR(R)-24/23-24 |
Tuesday, November 19, 2024 |
2015-2016 |
PETITION UNDER SECTION 94(1)(F) OF THE ELECTRICITY ACT,2003 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 FOR REVIEW OF FPPCA AND APR ORDER OF INDIA POWER CORPORATION LIMITED FOR THE FY 2015-16 ISSUED BY THE COMMISSION ON 10.07.2023 IN CASE NO. FPPCA-84/16-17 AND APR-67/17-18
|
3 |
WBSETCL |
TP(R)-49/24-25 |
Tuesday, November 19, 2024 |
2023-2024, 2024-2025, 2025-2026 |
IN REGARD TO APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR REVIEW OF THE TARIFF ORDER DATED 07.03.2024 PASSED BY THE HON'BLE COMMISSION IN CASE NO. TP-99/22-23 FOR THE TARIFF PERIOD FY 2023-24 TO 2025-26 UNDER REGULATION 3.3.1 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013, AS AMENDED
|
4 |
IPCL |
APR(R)-22/22-23 |
Wednesday, November 6, 2024 |
2014-2015 |
PETITION UNDER SECTION 94(1)(F) OF THE ELECTRICITY ACT, 20023 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 FOR REVIEW OF ANNUAL PERFORMANCE REVIEW ORDER OF INDIA POWER CORPORATION LIMITED FOR THE FY 2014-15 ISSUED BY THE COMMISSION ON 28.07.22 IN CASE NO. APR-60/16-17
|
5 |
APNRL |
TP(R)-52/24-25 |
Monday, October 28, 2024 |
2022-2023 |
IN REGARD TO THE APPLICATION SUBMITTED BY ADHUNIK POWER AND NATURAL RESOURCES LIMITED (APNRL) FOR REVIEW OF TARIFF ORDER FOR THE YEAR 2022-23 DATED 06.06.2024 PASSED BY THE COMMISSION IN CASE NO/ TP-100/22-23 UNDER SECTION 94(1)(F) OF THE ELECTRICITY ACT, 2003 READ WITH ORDER 47 RULE 1 OF THE CODE OF CIVIL PROCEDURE 1908 AND REGULATION 3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013
|
6 |
HEL |
FPPCA-98/20-21 AND APR-100/22-23 |
Wednesday, October 23, 2024 |
2019-2020 |
IN REGARD TO THE APPLICATIONS SUBMITTED BY HALDIA ENERGY LIMITED FOR APPROVAL OF FUEL AND POWER PURCHASE COST ADJUSTMENT (FCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR FY 2019-20
|
7 |
CESC Ltd |
FPPCA-99/20-21 & APR-83/20-21 |
Saturday, October 5, 2024 |
2019-2020 |
IN REGARD TO THE APPLICATION OF CESC LIMITED FOR FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2019-2020
|
8 |
IPCL |
TP(R)-32/21-22 |
Tuesday, October 1, 2024 |
2017-2018 |
IN REGARD TO PETITION SUBMITTED BY INDIA POWER CORPORATION LIMITED FOR REVIEW OF MYT ORDER DATED 28.01.2021 FOR THE YEAR 2017-2018 ISSUED BY THE COMMISSION IN CASE NO. TP-74/16-17
|
9 |
IPCL |
TP(R)-50/24-25 |
Friday, September 27, 2024 |
2020-2021, 2021-2022, 2022-2023 |
IN REGARD TO THE APPLICATION SUBMITTED BY INDIA POWER CORPORATION LIMITED (IPCL) FOR REVIEW OF MULTI YEAR TARIFF (MYT) ORDER OF IPCL FOR THE SEVENTH CONROL PERIOD COMPRISING OF THE FINANCIAL YEARS 2020-21, 2021-22 AND 2022-23 UNDER SECTION 94(1) (F) OF THE ELECTRICITY ACT, 20023 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013
|
10 |
DVC |
TP(R)-48/24-25 |
Tuesday, September 3, 2024 |
2020-2021, 2021-2022, 2022-2023 |
IN REGARD TO THE APPLICATION SUBMITTED BY DAMODAR VALLEY CORPORATION FOR REVIEW OF THE ORDER DATED 07.03.2024 PASSED BY THE COMMISSION IN CASE NO.TP-88/19-20 IN THE MATTER OF DETERMINATION OF TARIFF FOR DISTRIBUTION AND RETAIL SUPPLY OF ELECTRICITY IN DAMODAR VALLEY AREA IN THE STATE OF WEST BENGAL FOR THE PERIOD 2020-21 TO 2022-23
|
11 |
CESC Ltd |
TP-102/22-23 |
Tuesday, September 3, 2024 |
2023-2024, 2024-2025 |
IN REGARD TO THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEARS 2023-2024, 2024-2025 AND 2025-2026 UNDER SECTION 64(3)(a) READ WITH 62(1) AND SECTION 62(3)(a) OF THE ELECTRICITY ACT,2003
|
12 |
IPCL |
FPPCA-112/22-23 AND APR-103/22-23 |
Friday, August 16, 2024 |
2019-2020 |
REGARDING THE APPLICATION OF INDIA POWER CORPORATION LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2019-20
|
13 |
DPL |
APR-92/21-22 & FPPCA-101/21-22 |
Tuesday, July 16, 2024 |
2019-2020 |
IN REGARD TO THE APPLICATIONS SUBMITTED BY DURGAPUR PROJECTS LIMITED FOR APPROVAL OF FUEL COST ADJUSTMENT (FCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR FY 2019-20
|
14 |
DPL |
FPPCA-101(A)/21-22 (PART-II) AND APR-86/21-22 (PART-II) |
Tuesday, July 16, 2024 |
2018-2019 |
IN REGARD TO THE APPLICATIONS SUBMITTED BY DURGAPUR PROJECTS LIMITED FOR APPROVAL OF FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR FY 2018-19 [FROM 01.01.2019 TO 31.03.2019 (PART-II)]
|
15 |
DPL |
FPPCA-101(A)/21-22 (PART-I) AND APR-86/21-22 (PART-I) |
Tuesday, July 2, 2024 |
2018-2019 |
IN REGARD TO THE APPLICATIONS SUBMITTED BY DURGAPUR PROJECTS LIMITED FOR APPROVAL OF FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR FY 2018-19 [UPTO 31.12.2018 (PART-I)]
|
16 |
DVC |
TP(R)-51/24-25 |
Tuesday, July 2, 2024 |
2023-2024, 2024-2025, 2025-2026 |
IN REGARD TO THE APPLICATION SUBMITTED BY DAMODAR VALLEY CORPORATION FOR REVIEW OF THE ORDER DATED 13.03.2024 PASSED BY THE HON'BLE COMMISSION IN CASE NO. TP-104/22-23 IN THE MATTER OF DETERMINATION OF TARIFF FOR DISTRIBUTION AND RETAIL SUPPLY OF ELECTRICITY IN THE DAMODAR VALLEY AREA IN THE STATE OF WEST BENGAL FOR THE TARIFF PERIOD FOR FY 2023-24 TO 2025-26
|
17 |
CESC Ltd |
APR(R)-26/23-24 |
Tuesday, July 2, 2024 |
2018-2019 |
IN REGARD TO THE PETITION SUBMITTED BY CESC LIMITED FOR REVIEW OF THE ORDER DATED 22.09.2023 PASSED BY THE COMMISSION IN CASE NO. FPPCA-95/19-20 AND APR-80/19-20 UNDER SECTION 94(1)(F) OF THE ELECTRICITY ACT, 20023 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 READ WITH ORDER 47 RULE 1 OF THE CODE OF CIVIL PROCEDURE, 1908.
|
18 |
IPCL |
FPPCA-111/22-23 AND APR-102/22-23 |
Tuesday, July 2, 2024 |
2018-2019 |
REGARDING THE APPLICATION OF INDIA POWER CORPORATION LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2018-19
|
19 |
HEL |
FPPCA-96/19-20 AND APR-99/22-23 |
Wednesday, June 19, 2024 |
2018-2019 |
IN REGARD TO THE APPLICATIONS SUBMITTED BY HALDIA ENERGY LIMITED FOR APPROVAL OF FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR FY-2018-19
|
20 |
IPCL |
APR(R)-9/19-20 |
Thursday, June 13, 2024 |
2012-2013 |
PETITION UNDER SECTION 94(1)(f) OF THE ELECTRICITY ACT, 2003 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2013 FOR REVIEW OF ANNUAL PERFORMANCE REVIEW (APR) ORDER OF INDIA POWER CORPORATION LIMITED FOR THE FY 2012-13 ISSUED BY THE COMMISSION ON 02.12.2019 IN CASE NO. APR-41/13-14
|
21 |
APNRL |
TP-100/22-23 |
Thursday, June 6, 2024 |
2022-2023 |
IN REGARD TO THE TARIFF APPLICATION UNDER SEVENTH CONTROL PERIOD OF ADHUNIK POWER AND NATURAL RESOURCES LIMITED FOR THE YEAR 2022-23 AND UNDER 62(1) OF THE ELECTRICITY ACT, 2003
|
22 |
HEL |
FPPCA-94/18-19 AND APR-97/21-22 |
Thursday, May 16, 2024 |
2017-2018 |
IN REGARD TO THE APPLICATIONS OF HALDIA ENERGY LIMITED (HEL) FOR FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2017-18
|
23 |
DVC |
TP-104/22-23 |
Wednesday, March 13, 2024 |
2023-2024, 2024-2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY DAMODAR VALLEY CORPORATION FOR DETERMINATION OF TARIFF FOR DISTRIBUTION AND RETAIL SUPPLY OF ELECTRICITY FOR THE PART OF THE DAMODAR VALLEY AREA FALLING WITHIN THE TERRITORY OF THE STATE OF WEST BENGAL FOR THE YEARS 2023-2024 TO 2025-2026
|
24 |
IPCL |
TP-94/20-21 |
Wednesday, March 13, 2024 |
2020-2021, 2021-2022, 2022-2023 |
IN REGARD TO THE TARIFF APPLICATION OF INDIA POWER CORPORATION LIMITED FOR THE YEARS 2020-21, 2021-22 AND 2022-23 COVERING SEVENTH CONTROL PERIOD UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
25 |
HMEL |
TP-107/23-24 |
Tuesday, March 12, 2024 |
2023-2024, 2024-2025 |
IN REGARD TO THE MULTI YEAR TARIFF APPLICATION UNDER EIGHTH CONTROL PERIOD OF HIRANMAYE ENERGY LIMITED FOR THE YEARS 2023-24, 2024-25 AND 2025-26 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
26 |
DPL |
TP-106/22-23 |
Monday, March 11, 2024 |
2023-2024, 2024-2025 |
IN REGARD TO THE APPLICATION SUBMITTED BY THE DURGAPUR PROJECTS LIMITED FOR DETERMINATION OF TARIFF UNDER THE EIGHTH CONTROL PERIOD FOR THE YEARS 2023-24, 2024-25 AND 2025-26
|
27 |
DVC |
TP-88/19-20 |
Thursday, March 7, 2024 |
2020-2021, 2021-2022, 2022-2023 |
IN REGARD TO THE APPLICATION SUBMITTED BY DAMODAR VALLEY CORPORATION (DVC) FOR DETERMINATION OF TARIFF FOR DISTRIBUTION AND RETAIL SUPPLY OF ELECTRICITY FOR THE PART OF THE DAMODAR VALLEY AREA FALLING WITHIN THE TERRITORY OF THE STATE OF WEST BENGAL FOR THE YEARS 2020-2021, 2021-2022 AND 2022-2023
|
28 |
WBSETCL |
TP-99/22-23 |
Thursday, March 7, 2024 |
2023-2024, 2024-2025 |
IN REGARD TO THE PETITION SUBMITTED BY WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR DETERMINATION OF TARIFF UNDER 8TH CONTROL PERIOD FOR THE YEARS 2023-24, 2024-25 AND 2025-26 IN TERMS OF PROVISIONS STIPULATED IN THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011 AS AMENDED
|
29 |
IPCL |
FPPCA-105/21-22 AND APR-98/22-23 |
Thursday, March 7, 2024 |
2017-2018 |
REGARDING THE APPLICATIONS OF INDIA POWER CORPORATION LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2017-18
|
30 |
IPCL |
FPPCA-100/21-22 AND APR-88/21-22 |
Wednesday, March 6, 2024 |
2016-2017 |
REGARDING THE APPLICATIONS OF INDIA POWER CORPORATION LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2016-17
|
31 |
WBSEDCL |
TP-98/22-23 |
Wednesday, March 6, 2024 |
2024-2025 |
IN REGARD TO THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR THE YEARS 2023-2024, 2024-2025 AND 2025-2026 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
32 |
HEL |
TP-101/22-23 |
Wednesday, March 6, 2024 |
2023-2024, 2024-2025 |
IN REGARD TO THE MULTI YEAR TARIFF APPLICATION UNDER EIGHTH CONTROL PERIOD OF HALDIA ENERGY LIMITED FOR THE YEARS 2023-24, 2024-25 AND 2025-26 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
33 |
HEL |
FPPCA-88/17-18 AND APR-96/21-22 |
Wednesday, February 28, 2024 |
2016-2017 |
IN REGARD TO THE APPLICATIONS SUBMITTED BY HALDIA ENERGY LIMITED FOR APPROVAL OF FUEL COST ADJUSTMENT (FCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR FY 2016-17
|
34 |
DPL |
TP-93/20-21 |
Friday, February 23, 2024 |
2022-2023 |
IN REGARD TO THE MULTI YEAR TARIFF APPLICATION UNDER THE SEVENTH CONTROL PERIOD OF THE DURGAPUR PROJECTS LIMITED FOR THE YEAR 2022-23 UNDER SECTION 64(3)(a) READ WITH SECTION 62(1) AND 62(3) OF THE ELECTRICITY ACT, 2003
|
35 |
HEL |
FPPCA-106/21-22 AND APR-94/21-22 |
Thursday, February 22, 2024 |
2015-2016 |
IN REGARD TO THE APPLICATIONS SUBMITTED BY HALDIA ENERGY LIMITED FOR APPROVAL OF FUEL COST ADJUSTMENT (FCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR FY 2015-16
|
36 |
DVC |
APR-108/22-23 |
Thursday, January 11, 2024 |
2019-2020 |
IN REGARD TO THE APPLICATION FOR ANNUAL PERFORMANCE REVIEW FOR THE FINANCIAL YEAR 2019-20 IN RESPECT OF DISTRIBUTION AND RETAIL SUPPLY OF ELECTRICITY BY DAMODAR VALLEY CORPORATION FOR THE PART OF THE DAMODAR VALLEY ARE FALLING WITHIN THE TERRITORY OF THE STATE OF WEST BENGAL
|
37 |
WBPDCL |
TP-103/22-23 |
Wednesday, January 10, 2024 |
2023-2024, 2024-2025 |
IN REGARD TO THE MULTI YEAR TARIFF APPLICATION UNDER EIGHTH CONTROL PERIOD OF THE WEST BENGAL POWER DEVLEOPMENT CORPORATION LIMITED FOR THE YEARS 2023-24, 2024-25 AND 2025-26 UNDER SECTION 62(1) OF THE ELECTRICITY ACT, 2003
|
38 |
WBSETCL |
APR-105/21-22 |
Wednesday, January 3, 2024 |
2021-2022 |
IN REGARD TO THE APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW (APR) FOR THE YEAR 2021-22 UNDER REGULATION 2.6 OF THE WBERC (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011 AS AMENDED.
|
39 |
CESC Ltd |
TP-96/20-21 |
Monday, December 11, 2023 |
2022-2023 |
IN REGARD TO THE TARIFF APPLICATION OF CESC LIMITED FOR THE YEAR 2022-2023 UNDR SECTION 64(3)(a) READ WITH SECTION 62(1) AND SECTION 62(3) OF THE ELECTRICITY ACT, 2003
|
40 |
DVC |
APR-107/22-23 |
Monday, December 11, 2023 |
2018-2019 |
IN REGARD TO THE APPLICATION FOR ANNUAL PERFORMANCE REVIEW FOR THE YEAR 2018-19 SUBMITTED BY DAMODAR VALLEY CORPORATION (DVC) IN RESPECT OF DISTRIBUTION AND RETAIL SUPPLY OF ELECTRICITY IN THE PART OF DAMODAR VALLEY AREA FALLING WITHIN THE TERRITORY OF THE STATE OF WEST BENGAL
|
41 |
WBSETCL |
APR-87/21-22 |
Monday, December 11, 2023 |
2020-2021 |
IN REGARD TO THE APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW (APR) FOR THE YEAR 2020-21 UNDER REGYLATION 2.6 OF THE WBERC (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2011 AS AMENDED.
|
42 |
WBSETCL |
TP(R)-29/19-20 |
Wednesday, November 29, 2023 |
2014-2015, 2015-2016, 2016-2017 |
IN REGARD TO THE PETITION SUBMITTED BY THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR REVIEW OF TARIFF ORDER DATED 04.03.2015 FOR THE YEAR 2014-2015, 2015-2016 AND 2016-2017 IN CASE NO. TP-60/13-14
|
43 |
HEL |
APR-82/20-21 |
Wednesday, October 4, 2023 |
2019-2020 |
IN REGARD TO THE APPLICATION OF HALDIA ENERGY LIMITED FOR ANNUAL PERFORMANCE REVIEW (APR) OF ITS 400 KV DOUBLE CIRCUIT DEDICATED TRANSMISSION LINE FOR THE FINANCIAL YEAR 2019-2020
|
44 |
HEL |
APR-79/19-20 |
Wednesday, October 4, 2023 |
2018-2019 |
IN REGARD TO THE APPLICATION OF HALDIA ENERGY LIMITED FOR ANNUAL PERFORMANCE REVIEW (APR) OF ITS 400 KV DOUBLE CIRCUIT DEDICATED TRANSMISSION LINE FOR THE FINANCIAL YEAR 2018-2019
|
45 |
CESC Ltd |
FPPCA-95/19-20 AND APR-80/19-20 |
Friday, September 22, 2023 |
2018-2019 |
IN REGARD TO THE APPLICATION OF CESC LIMITED FOR FUEL & POWER PURCHASE COST ADJUSTMENT (FPPCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2018-2019
|
46 |
HEL |
FPPCA-81/16-17 AND APR-95/21-22 |
Friday, September 22, 2023 |
2014-2015 |
IN REGARD TO THE APPLICATIONS OF THE HALDIA ENERGY LIMITED (HEL) FOR FUEL COST ADJUSTMENT (FCA) AND ANNUAL PERFORMANCE REVIEW (APR) FOR THE FINANCIAL YEAR 2014-15
|
47 |
WBPDCL |
APR-91/21-22/PART-A |
Tuesday, September 19, 2023 |
2018-2019, 2019-2020, 2020-2021 |
IN REGARD TO THE PETITION FOR APPROVAL OF INPUT PRICE OF COAL SUPPLIED FROM BARJORA COAL MINE FOR FY 2018-19 TO FY 2020-21
|
48 |
DVC |
APR-106/22-23 |
Monday, September 18, 2023 |
2017-2018 |
IN REGARD TO THE APPLICATION FOR ANNUAL PERFORMANCE REVIEW FOR THE YEAR 2017-18 SUBMITTED BY DAMODAR VALLEY CORPORATION (DVC) IN RESPECT OF DISTRIBUTION AND RETAIL SUPPLY OF ELECTRICITY IN THE PART OF DAMODAR VALLEY AREA FALLING WITHIN THE TERRITORY OF THE STATE OF WEST BENGAL
|
49 |
DPL |
TP(R)-35/21-22 |
Tuesday, August 22, 2023 |
2020-2021, 2021-2022 |
IN REGARD TO PETITION UNDER SECTION 94(1)(F) OF THE ELECTRICITY ACT, 2003 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, FOR REVIEW OF THE TARIFF ORDER OF THE DURGAPUR PROJECTS LIMITED FOR THE YEARS 2020-2021 AND 2021-2022 IN CASE NO TP-93/20-21 DATED 16.07.2021
|
50 |
DPL |
TP(R)-31/20-21 |
Tuesday, August 22, 2023 |
2018-2019, 2019-2020 |
IN REGARD TO PETITION UNDER SECTION 94(1)(F) OF THE ELECTRICITY ACT, 2003 READ WITH REGULATION 3.3 OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, FOR REVIEW OF THE TARIFF ORDER OF THE DURGAPUR PROJECTS LIMITED FOR THE YEARS 2018-2019 (FROM 01.01.2019 TO 31.03.2019) AND 2019-20 IN CASE NO TP-87/19-20 (PART-II) DATED 13.11.2020
|